Sanctions Enforcement Directorate - Ministry of JusticeSkopjeTED
Professional Supervision over the Construction of Facilities at Idrizovo Correctional Facility - Central Service Unit, Pre-trial Unit, Closed Unit and Infrastructure at Idrizovo Correctional Facility (Segment II Stage 1)
Professional supervision over construction of Central Service Unit, Pre-trial Unit, Closed Unit and infrastructure at Idrizovo Correctional Facility (Segment II Stage 1).
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Sanctions Enforcement Directorate - Ministry of Justice
- Published:
- May 14, 2026
- Deadline:
- May 28, 2026
Tender description
Professional supervision over construction of Central Service Unit, Pre-trial Unit, Closed Unit and infrastructure at Idrizovo Correctional Facility (Segment II Stage 1).
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Rahmenvertrag Örtliche Bauaufsicht
Tirol Kliniken GmbHInnsbruckDeadline: Apr 17Rahmenvertrag für die örtliche Bauaufsicht. Los 1 umfasst Klein- und Mittelprojekte mit einer Honorarbezugssumme bis zur in der Ausschreibung definierten Grenze.Supervision of maintenance and protection of state roads
Public Entreprise for State Roads - SkopjeSkopjeDeadline: Jun 10Überwachung der Wartung und des Schutzes von Staatsstraßen. Der Auftrag umfasst die fachliche Begleitung und Kontrolle von Maßnahmen zur Instandhaltung und Sicherung des Straßennetzes.A12 INSB+GSA Zirl Ost – Zirl West + ASt Zirl West, km 87,300 – km 89,740
Autobahnen- und Schnellstraßen- Finanzierungs-AktiengesellschaftWienÖrtliche Bauaufsicht (ÖBA) für das Projekt A12 Instandsetzung und Grundhafterneuerung (INSB+GSA) im Bereich Zirl Ost bis Zirl West sowie die Anschlussstelle Zirl West zwischen km 87,300 und km 89,740.SIG65 - Supervision Services
LandsvirkjunReykjavíkDeadline: Jun 09Landsvirkjun invites tenders for on-site supervision of works under contracts: SIG10 (Civil Works), SIG30 (Generating Unit), SIG31 (Generator Step-up Transformer), SIG32 (Transmission Towers and Overhead Lines), SIG33 (Gate Equipment and Penstock), with possible extension to SIG19 (Finishing works). Further details in tender documents.Örtliche Bauaufsicht Tief- und Hochbau für Neubau/Umbau Umspannwerke
Austrian Power Grid AGWienDeadline: May 26Örtliche Bauaufsicht Tief- und Hochbau für Neubau/Umbau UmspannwerkeIngenieurleistungen zum Ausbau des Memeler Weges in Lüdenscheid
Stadt LüdenscheidLüdenscheidDeadline: Jul 01Ingenieurleistungen für den Ausbau des Memeler Weges in Lüdenscheid nach KAG NRW. Planung abgeschlossen, Tiefbauausschreibung Ende 2026. Umfasst Leistungsphasen 6-9 nach HOAI 2021 §47, örtliche Bauüberwachung, Bauvermessung und besondere Leistungen.(ProVia-ID 153052) Lieboch (e) - Köflach (e); GKB; Streckenattraktivierung Abschnitt 2; BAT007: Staatsgrenze nächst Jennersdorf - Graz Ostbf; Elektrifizierung, Bau; Baumanagement Kremser Tunnel (BL 30); Laßnitztunnel (BL 2.30)
ÖBB-Infrastruktur AGWienDeadline: May 15Baumanagement-Leistungen für die Baulose Kremser Tunnel (BL 30) im Rahmen der Streckenattraktivierung Lieboch–Köflach sowie für den Laßnitztunnel (BL 2.30) im Zuge der Elektrifizierung der Strecke Staatsgrenze nächst Jennersdorf–Graz Ostbf. In beiden Tunneln ist eine Querschnittsaufweitung erforderlich, um den notwendigen Raum für das Lichtraumprofil, den Stromabnehmer und das Tragwerk des Fahrdrahtes zu schaffen.Baumanager Phase ZWEI – Maurer Hauptplatz 5
Stadt Wien - Wiener WohnenWienBaumanager für die Phase ZWEI am Maurer Hauptplatz 5 in Wien 23.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 28. Mai 2026.
- Who is the contracting authority?
- The contracting authority is Sanctions Enforcement Directorate - Ministry of Justice.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.