Shannon Airport Authority DACShannonTED
Pre Qualification Questionnaire (PQQ) for an operator of the food and beverage concession at Shannon Airport
Pre Qualification Questionnaire (PQQ) für einen Betreiber der Lebensmittel- und Getränkekonzession am Flughafen Shannon.
Canteen Operation, Food Supply, Beverages, Fresh Produce, Bakery Products
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Shannon Airport Authority DAC
- Published:
- June 24, 2026
- Deadline:
- July 24, 2026
- Topic:
- Canteen Operation
Tender description
Pre Qualification Questionnaire (PQQ) für einen Betreiber der Lebensmittel- und Getränkekonzession am Flughafen Shannon.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
3RAM/001/2025 Pre-Qualification Questionnaire (PQQ) for the Award of a Concession for the Design, Build, Finance, Operate and Transfer Back of a National Farm Waste Treatment Facility
Rizorsi Agrikoli MaltaMarsaConcession contract for Design, Build, Finance, Operate, and Transfer Back (DBFOT) of a national farm waste treatment facility processing animal manure/slurry into renewable energy (biofuels), food-grade CO2, and organic soil enhancers. Construction phase ~1-2 years, followed by 25-year operational and maintenance phase.Annual Readvertisement of Qualification System for the Purchase and or Leasing of Buses and Coaches for Bus Éireann/Irish Bus - (Annual Readvertisement 3/8 - Amended)
Bus Eireann/Irish BusDublinDeadline: Mar 31Bus Éireann intends to procure low emission coaches and schools buses, and where possible zero-emission coaches with low environmental impact in compliance with the latest EURO VI Regulation. The vehicles will comply, as appropriate, with the EPA’s guidelines on road transport vehicles and the European Communities (Clean and Energy Efficient Road Transport Vehicles) (Amendment) Regulations 2021. To be considered for inclusion on a Qualification Panel(s), applicants must complete the Pre-Qualification Questionnaire (PQQ) providing relevant details in relation to the criteria set out below for assessment. It is envisaged that this qualification system will be used to either purchase and or lease during the five-year term of the Qualification System. Economic operators apply once to qualify onto the panel by providing details of their financial and technical capacity against predefined published Selection Criteria within a PQQ. The Qualification Panel for the Purchase and or Lease of Buses and Coaches will be broken down in to sub categories called Lot 1 – Purchase of Buses and Coaches Expressway, and Lot 2 – Lease of Buses and Coaches Expressway, Lot 3 - Purchase of School Buses and Coaches, Lot 4 - Lease of School Buses and Coaches, Lot 5 - Purchase of single or double deck city bus type vehicles and Lot 6 - Lease of single or double deck city bus type vehicles. Economic operators can apply for the Lot(s) that best reflect their commercial operations. Economic operators must complete a PQQ for the Lot(s) that they wish to qualify to. Only economic operators who satisfy the selection criteria of each individual Lot will qualify on to that Lot. After the initial advertisement, the panel must be advertised annually for the duration of the panel (5 years) to continually inform the market place of its existence. Economic Operators can apply to qualify on to the panel, throughout the duration of the panel. Economic Operators who are already qualified to the panel can also amend their application at any interval should their financial or technical capacity or capability change. Qualifying onto a panel does not guarantee any work and/or contracts to a supplier. There is no obligation to use the Qualification Panel and contracts can be advertised on an individual basis using the Negotiated Procedure. (Annual Readvertisement 3/8 - Amended)PQQ for the Design, Supply, Installation and Commissioning of a Flue Gas Abatement System at Medite Europe DAC
Medite Europe DACClonmelDeadline: Jun 26MEDITE Europe DAC is invites expressions of interest from experienced and qualified companies for the design, supply, installation and commissioning of a flue gas abatement system and associated ancillaries for a biomass boiler installation. A system will be required to treat the boiler flue gas stream and reduce particulate emissions in order to support safe, reliable and compliant plant operation. The proposed solution shall be suitable for the defined operating conditions, including flue gas flow, temperature, moisture content and dust loading, and shall be capable of integration with the existing boiler, draft system, stack and plant control infrastructure. The scope is expected to include, as applicable, the main abatement equipment, inlet and outlet ductwork interfaces, support steelwork, access platforms, insulation, ash collection and discharge arrangements, instrumentation, controls, electrical integration, and all associated ancillaries necessary for a complete and operable system. The system should be designed to achieve the required emissions performance while maintaining acceptable pressure drop, operability, maintainability and safe access for inspection and maintenance. The proposed equipment must be of proven industrial technology and conform to best practice design principles and all relevant European legislation and standards, including CE marking where applicable. The successful contractor shall be expected to undertake detailed engineering, equipment manufacture and supply, delivery to site, erection, testing, commissioning, performance verification, operator training and handover of the complete system, together with the provision of all relevant drawings, manuals and technical documentation. It is anticipated that this pre-qualification process will be followed by technical proposal evaluation and a subsequent detailed tendering stage for the selected bidders.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 24. Juli 2026.
- Who is the contracting authority?
- The contracting authority is Shannon Airport Authority DAC.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.