New: market reports on German public procurement Read the report

Statens vegvesenMossTED

National road 555 Nygårdstunnelen - upgrading of tunnels

Nygårdstunnelen in Bergen was opened in 1999 and is 864 metres long. The tunnel runs from the Puddefjord Bridge to Nygårdstangen, with exit ramps at O.J. Brochsgate. There are 2 lanes from the Puddefjord Bridge, whilst there are 1 lanes from O.J. Brochs gate. These meet in the tunnel so that there are 3 lanes at the exit and entrance at N...

Submission deadline: September 14, 2026Type: Tender

Engineering Structures, Heating & Air Conditioning, Electrical Installation, Fire Protection, Building Automation

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Statens vegvesen
Published:
August 16, 2026
Deadline:
September 14, 2026
Topic:
Engineering Structures
Object:
Tunnel / Unterführung

Object classification

  • Tunnel / UnterführungPrimary

Tender description

Show full description

Nygårdstunnelen in Bergen was opened in 1999 and is 864 metres long. The tunnel runs from the Puddefjord Bridge to Nygårdstangen, with exit ramps at O.J. Brochsgate. There are 2 lanes from the Puddefjord Bridge, whilst there are 1 lanes from O.J. Brochs gate. These meet in the tunnel so that there are 3 lanes at the exit and entrance at Nygårdstangen. The annual daily traffic is approx. 45,000. The tunnel shall be upgraded in accordance with the tunnel safety regulations and equipment in and outside the tunnel shall be replaced and replaced with new equipment that meets the current requirements. This includes, among other things: • New ventilation system. • New lighting installations with both new lights in the tunnel roof and continuous evacuation lights. • Extinguishing water shall be set up for the fire brigade. New system for handling emissions and tunnel washing water that fulfils emission requirements. • New signage with barriers, lane signal and variable signs. • Emergency stations with fire extinguishers and telephones. • Camera with coverage throughout the entire tunnel, which gives an alarm during events. • New technical building in the tunnel in the existing mountain room. • A new stop section shall be established at the technical building. • Demolition of existing air treatment plant.

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

7 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

8

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 14. September 2026.
Who is the contracting authority?
The contracting authority is Statens vegvesen.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "National road 555 Nygårdstunnelen - upgrading of tunnels" from Statens vegvesen and keep track of deadlines and submission guidelines.

Deadline tracked until September 14, 2026No credit card required