Oslo kommune, BymiljøetatenOsloTED
Market survey on the construction of a fountain facility at Aud Blegen Svindlands plass 45-BYM-2026
Market survey for fountain facility at Aud Blegen Svindlands plass shut down spring 2025. Risk analysis recommends measures: reduce health risks, establish disinfection system, ensure safe operation. Contracting authority plans procurement autumn 2026 for engineering design and execution. Survey gathers input for tender documentation, req...
Water Supply
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Oslo kommune, Bymiljøetaten
- Published:
- June 08, 2026
- Deadline:
- July 09, 2026
- Topic:
- Water Supply
- Object:
- Garten- / Landschaftsbau (Außenanlage allgemein)
Object classification
- Garten- / Landschaftsbau (Außenanlage allgemein)Primary
Tender description
Market survey for fountain facility at Aud Blegen Svindlands plass shut down spring 2025. Risk analysis recommends measures: reduce health risks, establish disinfection system, ensure safe operation. Contracting authority plans procurement autumn 2026 for engineering design and execution. Survey gathers input for tender documentation, requirements, award criteria, and competition parameters. See attached risk analysis by Sweco (July 2025) and assignment description.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
4 data areas available
30 days free · no credit card · cancel anytime
Related tenders
10CT2093/2025 DESIGN AND BUILD TENDER FOR THE CONSTRUCTION OF A SKIP MANAGEMENT FACILITY AND AMENITIES AT ECOHIVE COMPLEX, MAGĦTAB WITH A REDUCED ENVIRONMENTAL IMPACT
Department of ContractsFlorianaDESIGN AND BUILD TENDER FOR THE CONSTRUCTION OF A SKIP MANAGEMENT FACILITY AND AMENITIES AT ECOHIVE COMPLEX, MAGĦTAB WITH A REDUCED ENVIRONMENTAL IMPACTCT2154/2026 - TENDER FOR THE SUPPLY OF QTY 2 INTRA-OPERATIVE NERVE MONITORING SYSTEMS (ON LEASE) AND CONSUMABLES ON A PAY-PER-USE BASIS FOR ENT AND GENERAL SURGERY AT THE OPERATING THEATRE DEPARTMENT AT MATER DEI HOSPITAL
Department of ContractsFlorianaDeadline: Jul 14CT2154/2026 - TENDER FOR THE SUPPLY OF QTY 2 INTRA-OPERATIVE NERVE MONITORING SYSTEMS (ON LEASE) AND CONSUMABLES ON A PAY-PER-USE BASIS FOR ENT AND GENERAL SURGERY AT THE OPERATING THEATRE DEPARTMENT AT MATER DEI HOSPITALCT2081/2026 DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF A GENERAL EXHAUST VENTILATION SYSTEM AT THE MATERIAL RECOVERY FACILITY (MRF) AT ECOHIVE
Department of ContractsFlorianaDeadline: Jun 18Design, supply, installation and commissioning of a general exhaust ventilation system at the Material Recovery Facility (MRF) at EcoHive.SPD6/2026/013 - TENDER FOR THE ESTABLISHMENT OF A LEGAL FRAMEWORK ON GLOBAL WARMING POTENTIAL CALCULATION ASSOCIATED WITH THE LIFECYCLE OF ALL NEW BUILDINGS FOR THE BUILDING AND CONSTRUCTION AUTHORITY (BCA)
Department of ContractsFlorianaDeadline: Aug 10SPD6/2026/013 - TENDER FOR THE ESTABLISHMENT OF A LEGAL FRAMEWORK ON GLOBAL WARMING POTENTIAL CALCULATION ASSOCIATED WITH THE LIFECYCLE OF ALL NEW BUILDINGS FOR THE BUILDING AND CONSTRUCTION AUTHORITY (BCA)CT3029/2026 - Tender for A Proposed Construction of A Bird Observatory including The Formation of 3 No. Brackish Water Ponds for Wader Species at Ghadira S-Safra
Department of ContractsFlorianaDeadline: Jul 27CT3029/2026 - Tender for A Proposed Construction of A Bird Observatory including The Formation of 3 No. Brackish Water Ponds for Wader Species at Ghadira S-SafraIMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Infrastructure MaltaLuqaDeadline: Aug 03Construction of a new cargo facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.CT2057/2026 - TENDER FOR THE SUPPLY OF DEEP BRAIN NEURO STIMULATOR SYSTEM FOR THE NEUROSCIENCES DEPARTMENT (NEUROSURGERY) AT MATER DEI HOSPITAL TO RUN ON A PAY PER USE BASIS FOR A TOTAL PERIOD OF 3 YEARS
Department of ContractsFlorianaDeadline: Jul 24CT2057/2026 - TENDER FOR THE SUPPLY OF DEEP BRAIN NEURO STIMULATOR SYSTEM FOR THE NEUROSCIENCES DEPARTMENT (NEUROSURGERY) AT MATER DEI HOSPITAL TO RUN ON A PAY PER USE BASIS FOR A TOTAL PERIOD OF 3 YEARSDruckwasser- und EW-Leitungen im Rutschhang Brienz
Gemeinde Albula/AlvraTiefencastelDeadline: Jul 12Die Gemeinde Albula/Alvra plant im Bereich der Rutschkante Vazerol die Neuerstellung der Trinkwasserleitung samt Schächten. Im Zuge dieser Erneuerung wird die Linienführung der Strasse an die aktuellen Verhältnisse angepasst. Zur statischen Entlastung des Hangs ist zudem ein Abtrag von rund 7'000 m³ Erdmaterial vorgesehen, wovon rund 1'000 m³ oberhalb bei der Voia da Brianzauls wieder aufgefüllt werden.Gemeinde Bottighofen, Sanierung und Aufwertung Wigärtlistrasse
Gemeinde Bottighofen Tiefbau (Planimpuls AG)BottighofenDeadline: Aug 04Die Gemeinde Bottighofen beabsichtigt, die Werkleitungen zu erneuern und den Strassenraum der Wigärtlistrasse aufzuwerten. Im Rahmen des Projekts wird die bestehende, über 50 Jahre alte Wasserleitung durch eine neue PE-Leitung ersetzt. Gleichzeitig werden die Hausanschlüsse im öffentlichen Bereich saniert sowie die Hydrantenanlagen erneuert. Parallel dazu erweitert und erneuert die Elektra Bottighofen ihre Leerrohr- und Kabelanlagen. Zur Verbesserung der Versorgungssicherheit wird eine neue Verteilkabine erstellt und die betroffenen Liegenschaften mehrheitlich neu erschlossen. Zudem wird ein Erdungsleiter mitverlegt. Im Rahmen der GEP-Bearbeitung wurde der bestehende Mischwasserkanal untersucht und es wurde kein Sanierungsbedarf festgestellt. Eine Erweiterung der Gasversorgung ist nicht vorgesehen. Nach Abschluss der Werkleitungsarbeiten wird die vollständige Sanierung der Strassenoberfläche durchgeführt. Die bestehende Fundation kann dabei weiterverwendet werden. Zudem wird der Strassenraum gestalterisch aufgewertet. Im Zuge der geplanten Strassensanierung werden die bestehenden Leuchten durch energieeffiziente LED-Leuchten ersetzt und an die neue Strassenraumgestaltung angepasst. Die Strassenentwässerung wird über Grünrabatten mit Baumstandorten und ergänzende Einlaufschächte sichergestellt. Dadurch wird die Versickerung von Oberflächenwasser gefördert und die Entwässerung bei Starkregen gewährleistet.Wasserversorgung GWV Erbenhausen, Neubau Hochbehällter und Wasseraufbereitung Schafhausen, Erneuerung Quellsammelschacht Schafhausen, Verbindungsleitungen
Kommunaler Wasser- und Abwasserzweckverband Meininger UmlandMeiningenDeadline: Jun 25'- 1 Stück bauseits gelieferten Quellsammelschacht einbauen - 1 Bauwerk einschließlich technischer Ausrüstung für Trinkwasseraufbereitung, einschließlich Pumpstation und Außenanlagen - Einbau eines bauseits gelieferten Hochbehälters, Volumen 2 x 60 m³, einschließlich Außenanlagen - ca. 1.600 m Rohrgräben für Füll-, Fall- und Entleerungsleitungen, sowie Steuer- und Energiekabel einschließlich Rohrleitungsbau, Armaturen, Knotenpunkte sowie Oberflächenwiederherstellung - Ausgleichs- und Ersatzmaßnahmen gemäß landschaftspflegerischem Begleitplan
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 09. Juli 2026.
- Who is the contracting authority?
- The contracting authority is Oslo kommune, Bymiljøetaten.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.