Lødingen KommuneLødingenTED
Lødingen Municipality - Framework agreement electric power for delivery 2028 - 2030
Physical delivery of approx. 5.7 GWh electricity per annum. Guarantee of origin. Billing the grid charge and fees. Energy statistics.
Energy Supply
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Lødingen Kommune
- Published:
- August 12, 2026
- Deadline:
- September 17, 2026
- Topic:
- Energy Supply
Tender description
Physical delivery of approx. 5.7 GWh electricity per annum. Guarantee of origin. Billing the grid charge and fees. Energy statistics.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Related tenders
8Herøy Municipality - Framework agreement electric power for delivery 2027 - 2029
Herøy kommuneHerøyDeadline: Sep 07Physical delivery of approx. 4.5 - 5.3 GWh electric power per annum. Energy statistics. Billing the grid charge and fees. Energy statistics. Guarantee of origin.Herøy kommune - Framework agreement electric power for delivery 2027 - 2029
Herøy kommuneHerøyDeadline: Sep 07Physical delivery of approx. 4.5 - 5.3 GWh electric power per annum. Energy statistics. Billing the network charge and fees. Energy statistics. Guarantee of origin.Framework Agreement for the delivery of Emergency Power Systems - Lot 2
50Hertz Transmission GmbHBerlinLot 2 includes the delivery of emergency power systems (20kVA and 50kVA) with a volume of 40%.Framework Agreement for the Delivery of Emergency Power Systems 50Hertz Transmission
50Hertz Transmission GmbHBerlinThe Services include the design engineering / supply / FAT / delivery / unloading on foundation and commissioning of “Emergency Power Systems” 20kVA and 50kVA including all accessories to substations as well as any related services to TSO’s Onshore and/or Offshore substations as described in the contractual documents. Estimated quantities for the framework agreement term across all types of emergency power systems are for lot 1 26 units/containers (maximum 52 units) and for lot 2 18 units/containers (maximum 36 units). However, there is no volume commitment. Further information can be obtained from the tender documents.Framework Agreement for Plumbing Services, Maintenance and Associated Materials for Måsøy Municipality 2026–2030
Måsøy MunicipalityHavøysundDeadline: Sep 15Måsøy Municipality (K_5618) intends to enter into a framework agreement with one (1) supplier for the provision of plumbing services and associated materials for the municipality’s departments, facilities and buildingsFramework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Trianel Energieprojekte GmbH & Co. KGAachenDeadline: Sep 14TEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.The establishment of 8 multi-party framework agreements for the delivery of training services: Category 3 and Category 4
Engineering SkillnetDublinDeadline: Sep 16This competition relates to the establishment of two multi-party framework agreements: Category 3 - Operational Excellence and Leadership and: Category 4 - Regulation, Standards and Risk Management. Wide ranging training is required and divided into the following Categories as outlined above. • Category No 3: Operational Excellence and Leadership • Category No. 4: Regulation, Standards and Risk Management The frameworks will be used for technical up-skilling and transversal development of adult learners working in industry to include certified pathways (QQI and NFQ – all levels) and uncertified/bespoke training such as but not limited to hands-on workshops, blended/modular programmes, and Work-Based Learning. Training can take place at various locations nationwide in person or online Provision of training aims to develop a highly skilled workforce for green and digital transitions across manufacturing, fabrication, civil infrastructure, and heavy engineering sectors included but not limited to the following: • Agricultural and Marine, • Automotive, Aerospace and Defence, • Engineering and Building services, • Energy and Environment, • Industrial Automation, • Materials handling, • Metal fabrication and Processing, • Packaging, Paper and Print • Precision Engineering There is no guarantee of additional contracts, but where they arise, the Contracting Authority will consult the members of the framework agreement in accordance with the rules of operation outlined in this Request for Tender.The establishment of 8 multi-party framework agreements for the delivery of training services: Category 1 and Category 2
Engineering SkillnetDublinDeadline: Sep 16This competition relates to the establishment of two multi-party framework agreements: Category 1 - Advanced Technical and Digital Engineering and: Category 2 - Infrastructure, Renewables and Sustainability. Wide ranging training is required and divided into the following Categories as follows, with 4 sub-categories defined under each primary category – each being awarded as a separate lot. • Category 1: Advanced Technical and Digital Engineering • Category 2: Infrastructure, Renewables and Sustainability The frameworks will be used for technical up-skilling and transversal development of adult learners working in industry to include certified pathways (QQI and NFQ – all levels) and uncertified/bespoke training such as but not limited to hands-on workshops, blended/modular programmes, and Work-Based Learning. Training can take place at various locations nationwide in person or online. Provision of training aims to develop a highly skilled workforce for green and digital transitions across manufacturing, fabrication, civil infrastructure, and heavy engineering sectors included but not limited to the following: • Agricultural and Marine, • Automotive, Aerospace and Defence, • Engineering and Building services, • Energy and Environment, • Industrial Automation, • Materials handling, • Metal fabrication and Processing, • Packaging, Paper and Print • Precision Engineering There is no guarantee of contracts, but where they arise, the Contracting Authority will consult the members of the framework agreement in accordance with the rules of operation outlined in this Request for Tender.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 17. September 2026.
- Who is the contracting authority?
- The contracting authority is Lødingen Kommune.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.