UNESCOAfghanistan
ITB for Preserving Heritage Properties and Upgrading Informal Settlement within historical sites in Daudi valley (Daudi Bala and Daudi Payan) of Bamiyan province in Afghanistan.
This ITB targets contractors specialized in heritage preservation engineering works those only operating in Afghanistan. The Preserving Heritage Properties and Upgrading Informal Settlement work in this ITB covers the following activities in two villages (Daudi Bala and Daudi Payan) of Daudi Valley of Bamiyan city: 1. Lining of a drain/ca...
Earthworks, Masonry, Sewer Construction, Paving, Noise Protection
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- UNESCO
- Published:
- August 18, 2026
- Deadline:
- September 06, 2026
- Topic:
- Earthworks
Tender description
Show full descriptionCollapse description
This ITB targets contractors specialized in heritage preservation engineering works those only operating in Afghanistan. The Preserving Heritage Properties and Upgrading Informal Settlement work in this ITB covers the following activities in two villages (Daudi Bala and Daudi Payan) of Daudi Valley of Bamiyan city: 1. Lining of a drain/canal from upper part of Daudi Payan coming down through the village and joining the main canal flowing in the end of Daudi village. The length of the drain is about 360m long with width of 1-1.5m and depth of 1.5 to 2m.The stone masonry work requires excavation, stone masonry with cement mortar, boulders, top and bottom PCC, in some parts filling of the drain with rushed/mix materials. 2. Construction of culverts: Construction of 6 culverts, of various size and type (box culverts and pipe culverts) as per specifications andBoQ. The work requires excavation, stone masonry, top and bottom PCC, boulders, RCC Slab, watering, etc. 3. Improvement of access road: The access road through Daudi Balaand Daudi Payan village that is all together around 1000m long,with cutting, filling, gravelling, watering and compaction as perBoQ. Around 800m road is in Doudi Bala and 200m in DaudiPayan. 4. Gabion work: The drains in Daudi Bala comes down near to the east Buddha and the water is stored in a huge pit and become reservoir that can cause damage to the two footpaths that connect the village to the main access path leading to Bamiyan Bazar and the other that goes to the east Buddha. This junction needsGabion boxes with some backfilling to stabilize the entire area.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
3 data areas available
30 days free · no credit card · cancel anytime
Related tenders
10Entrance Road Reconstruction and Ancillary Works, Whitefields Depot, Phoenix Park
Office of Public Works (OPW)TrimThe Works involve the removal and disposal of the existing road structure, with reuse of bitumen material on site, construction of a new road surface, new concrete kerbing, and of ancillary improvements, including the refurbishment and relaying of dilapidated cast iron toe rails, taking up and relaying of granite thresholds at the entrance gate, and the taking up and relaying of cobble kerb lines along designated sections of roadway on the Entrance Road serving Whitefields Depot within Phoenix Park, Dublin 8. Whitefields entrance road works to occur out of hours on weekends to facilitate the continued operational use of the OPW Whitefields compound during normal daily work hours. Pricing, programme and traffic management plan are to reflect this.HCS 0319 - Construction of 30no. social housing units and all associated site development works at Cois Abhainn (Phase 3), St. Johnston, Co. Donegal
Donegal County Council_1193LiffordThe works comprise of the construction of 30no. two storey social housing units consisting of 4no. 1 bedroom apartments, 4no. 2 bedroom apartments, 8no. 2 bedroom houses, 12no. 3 bedroom houses, 2no. 4 bedroom houses. The associated site works and services consist of the following non exhaustive list: site clearance and excavation works, ESB diversions, new access roads, resurfacing of existing roads, retaining walls, footpaths, on site surface water attenuation, underground static water storage tanks, carparking, construction of new foul and surface water connections to include upgrade of existing foul wastewater pumping station with a new rising main and installation of watermain booster pump.Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Údarás Na Gaeltachta_289GalwayThe proposed works will include internal modification, the construction of an extension (10m2), a glazed entrance lobby and a covered outdoor area, replacement of the existing wastewater treatment system and percolation area with a packaged Wastewater Treatment System and all associated works.Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+
Iarnród Eireann-Irish RailDublinDeadline: Oct 24This is a call to competition by IE for the procurement of a Design and Build Civil and Structural Contractor by way of a single supplier Framework Agreement, one Contractor will be the sole supplier. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, electrified, reliable and more frequent rail service improving capacity in all rail corridors serving Dublin, bringing DART travel with all its benefits to new and existing communities. The provision of a new electrified fleet will improve capacity and reduce greenhouse gas emissions.Erneuerung Außenentwässerung Technik in Außenanlagen
Immobilien Bremen - Eigenbetrieb der Stadtgemeinde BremenBremen60 m PP-Rohr DN100-DN200 Bogen Abzweige, Muffen, Reduzierungen etc. 150 m³ Graben ausheben von 0,80 bis 1,75m 5 m³ Graben in Handschacht 35 m³ Bodenaustausch verdichten, verfüllen 200 m² Pflaster aufnehmen und verlegen 5 m³ Hindernisse im Boden 4 Stck. Schacht LW600 1 Stck. Regenversickerung 25 m³ mit FilterschachtDurchlasserneuerung L52 und B68
Niedersächsische Landesbehörde für Straßenbau und Verkehr - Geschäftsbereich LingenLingen (Ems)Deadline: Aug 18Durchlass- und Schachterneuerung an der L52 im Straßenmeistereibezirk Papenburg. Sowie eine Durchlasserneuerung an der B68 im Straßenmeistereibezirk Löningen.In Bremen werden in den stadtnahen Staddteilen 11 neue Car-Sharing Stationen mit 30 Stellplätzen geplant. Pro Standort sollen zwei bis vier Stellplätze errichtet werden.
BREPARK Bremer Parkraumbewirtschaftungs- und management GmbHBremenTiefbauarbeiten zur Herstellung von 11 mobil.punkten auf bestehenden Stellplätzen im Bremer Stadtgebiet.Bachstraße Arloff - Straße und Brücken
Stadt Bad MünstereifelBad MünstereifelDurch die Hochwasserkatastrophe im Juli 2021 kam es in der Bachstraße in Bad Münstereifel Ortsteil Arloff zu Zerstörungen, so dass die betroffene Straße sowie die beiden Fußgängerbrücken über die Erft über den Wiederaufbauplan (WAP) erstellt werden. Parallel zu den Straßenbauarbeiten und Brücken sind nachfolgende Maßnahmen zu berücksichtigen: a) Elektroverkabelung (Kostenträger e-regio) b) Gasleitungshausanschlüsse (Kostenträger e-regio) c) Entwässerungskanalarbeiten (Kostenträger Stadtwerke Bad Münstereifel) d) Wasserleitungshausanschlüsse (Kostenträger Stadtwerke Bad Münstereifel) Sowohl e-regio als auch die Stadtwerke beabsichtigen hier den Auftragnehmer mit der Ausführung der Arbeiten lt. LV Titel Nr. 2, 3, 4 und 5 eigenständig zu beauftragen. e-regio wird i.Z. der Baumaßnahme den Zustand von Gasleitungshausanschlüssen prüfen und ggf. Erneuerungsmaßnahmen durchführen. Hier fallen noch weitere Erdarbeiten im Auftrag der e-regio an. Die Bewertung der eingereichten Referenzen erfolgt nach der beigefügten Bewertungsmatrix in den Vergabeunterlagen. Es handelt sich bei diesem Projekt um eine durch das Land Nordrhein-Westfalen und die Bundesrepublik Deutschland geförderte Maßnahme zur Beseitigung von Schäden an öffentlicher und privater Infrastruktur sowie zum Wiederaufbau anlässlich der Starkregen- und Hochwasserkatastrophe im Juli 2021 (Förderrichtlinie (FRL) Wiederaufbau Nordrhein-Westfalen) vom 27. Mai 2025.Contract award - 260737 Vollabakken road and water and sewage.
Trondheim kommuneTRONDHEIMTrondheim municipality, hereafter called the contracting authority, invites tenderers to an open competition for a contract in the project Contract Vollabakken Road and Water and Sewage. The municipality would like tenders from tenderers with the professional, technical and economic basis necessary for fulfilment of the contract. The competition will be carried out via the municipality ́s tender implementation tool Mercell. All communication and tender submissions will be via Mercell.16., Degengasse von Wurlitzergasse bis Vorortelinie
Magistrat der Stadt Wien - Magistratsabteilung 28WienStraßenbau-, Pflasterungs- und Nebenarbeiten
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 06. September 2026.
- Who is the contracting authority?
- The contracting authority is UNESCO.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.