European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsTED
Further development of the sustainable district heating systems in Upper Nitra region (2026CE160AT046)
The objective is to assist regional and local authorities, DH suppliers and stakeholders in improving their capacity to identify, plan, develop and implement measures for DHS restructuring within the legal framework of EU/2023/2413 and EU/2023/1791. Specific technical assistance will enable implementation of DHS improvements with direct i...
Urban Planning, Architecture, Energy Consulting, Water Resource Management, Construction Project Management
No credit card · Instant access
Content at a glance
The objective is to assist regional and local authorities, DH suppliers and stakeholders in improving their capacity to identify, plan, develop and implement measures for DHS restructuring within the legal framework of EU/2023/2413 and EU/2023/1791. Specific technical assistance will enable implementation of DHS improvements with direc...
- Tender type:
- Tender
- Contracting authority:
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
- Published:
- June 24, 2026
- Deadline:
- September 10, 2026
- Topic:
- Urban Planning
Tender description
The objective is to assist regional and local authorities, DH suppliers and stakeholders in improving their capacity to identify, plan, develop and implement measures for DHS restructuring within the legal framework of EU/2023/2413 and EU/2023/1791. Specific technical assistance will enable implementation of DHS improvements with direct impact on socio-economic and environmental transition to climate neutrality in the Upper Nitra region.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- 50Hertz Transmission GmbHBerlin
Market Consultation - Questionnaire on the Further Development of HVDC Multiterminal Systems towards Multi-Vendor
In 2024, the four German TSOs (4GTSO) - 50Hertz Transmission GmbH, Amprion GmbH, TenneT TSO GmbH and TransnetBW GmbH - jointly concluded contracts, following an EU-wide procurement process, for the research and development of 525 kV Bipole HVDC single-vendor Multiterminal systems. This technology allows the flexible interconnection of multiple HVDC lines, so-called DC-Hub projects. Following this approach, the 4GTSOs are now aiming to take the next step in advancing the technology by transitioning from a single-vendor to a multi-vendor setup. As an initial step, the 4GTSOs intend to conduct a gap analysis as part of this market consultation to identify key blocking points related to this transition and to gather the market’s perspective. To this end, the 4GTSOs have developed a structured questionnaire. For further information, please refer to the questionnaire, which can be accessed via the following link: https://eliagroup.sharepoint.com/:b:/s/EFSS/EFSS/IQB6sARohhDwT56bMNlq6H3-ASgbMD65Kyk4QeUU5v_fpGw?e=DNOdsh We kindly ask you to provide your written feedback by 31st August 2026. Please submit your response via email to [email protected]. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHN/ADeadline: Aug 07
Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva
Art der Leistung 10037842-Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva Umfang der Leistung The contractor is tasked with delivering three key work packages, each with specific objectives and timelines: 1. Inception Report: The first deliverable will be an inception report that outlines the methodology and planning for the surveys. This report is aimed at establishing a clear framework for survey approaches, data collection, analysis as well as Midline and Endline report structure. Work on this report is set to commence in August 2026, ensuring adequate preparation and planning for the subsequent phases of the project. Regarding the qualitative data collection approach, the contracts should specify a qualitative method applicable to the indicators. The proposed methods may include Key Informant Interviews (KIIs), Focus Group Discussions (FGDs), and direct observation during site visits - are deployed in sequence across the three phases of data collection. Data is analysed thematically and triangulated with quantitative findings before results are finalised Moreover, the contractor will establish a comprehensive, verified, and evidence-based data collection that accurately measures employment, local value addition, export market performance, sustainability certification, MSME processing capacity and IAF service improvement across all targeted indicators. 2. Midline Assessment Report: The second deliverable will be a comprehensive mid-term assessment report, which will evaluate the progress and indicators achievement of the project to date. This report is expected to be finalized and submitted in the fourth quarter of 2026. It will include detailed findings, insights, and recommendations that will guide any necessary adjustments to the project's approach. 3. Endline Assessment Report: The final work package involves delivering a project end-term assessment report, expected in the fourth quarter of 2028. This report will conduct an in-depth analysis of the indicators" achievement, impact and effectiveness of the EU-German CAPSAFE intervention throughout the entire execution period. It will synthesize data collected over the course of the project and provide a thorough evaluation of the results achieved, to some extent offering valuable insights for future initiatives. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Development of relevant planning tools for water security and climate resilience in Urban Areas in Tanzania (Output 2 and Output 3 of ProWaS)
GIZ has been commissioned to implement the project "Water Security and Climate Resilience for Urban Areas and their Catchments in Tanzania (ProWaS)" in Tanzania on behalf of the German Federal Ministry of Economic Cooperation and Development (BMZ). The Overall Objective of the project is the sustainable improvement of the population"s access to drinking water and sanitation services, as well as the management of water resources. GIZ"s political implementation partner is the Ministry of Water, and coordination subnational entities such as Basin Water Boards, Catchment Committees, Water Supply and Sanitation Authorities, and Local Government Authorities is also key to the project methodology. As part of the process to achieve universal access to water as envisioned in the Tanzania Development Vision 2025, water sector stakeholders, guided by the Ministry of Water, have introduced three instruments as part of the Water Sector Development Programme: (1) Joint Town-level Master Planning (JTPs): Assist Water Supply and Sanitation Authorities (WSSAs) and Local Government Authorities (LGAs) to coordinate joint planning and investment decisions to improve access to water and sanitation; (2) Water Safety Planning (WSPs): Guide WSSAs to identify risks (in particular climate-change) affecting water quality and quantity and develop mitigation measures to address these risks via a participatory approach; (3) Water Allocation Planning (WAPs): Guide Basin Water Boards (BWBs) to make equitable allocations of water resources for different water users and the environment. The JTPs and CR-WSPs are among the key performance indicators for Water Supply and Sanitation Authorities (WSSAs) in Tanzania and the WAPs are among the key performance indicators for BWBs in Tanzania. The Ministry of Water has requested the Federal German Government through ProWaS to upscale the JTPs and CR-WSPs to more urban areas and WSSAs as well as create new WAPs in Tanzania. The contractor will on behalf of the ProWaS project create 3 JTPs, and 3 WAPs in accordance with the respective guidelines prepared by the Ministry of Water. The CR-WSPs are not in the scope of this contract. This will require close coordination with the GIZ Project Team in Tanzania as well as National, Regional, and Local Tanzanian water authorities. The JTPs are defined by the municipality (i.e. town) in a particular region, while the WAPs are defined by the basin and the sub-catchment. A team of national and international experts shall be provided by the Contractor for this purpose. Through the completion of the three aforementioned Work Packages, the contractor is responsible for contributing to the Module Objective, Output 2, Output Indicator 2.2, and Output 3 and is responsible for achieving Module objective Indicator 3 and Output indicator 2.1 as described in this document. The Module Objective is, "The framework for improving water security in catchments of urban areas is adapted to the challenges of climate change." Output 2 is as follows: "Water and sanitation authorities, in collaboration with local consultants, have identified priority projects to improve access to climate-resilient water and sanitation services." It is accompanied by the following two indicators: Indicator 2.1: Fifteen JTPs have been drawn up by WSSA together with Local Government Authorities (base value of 5 JTPs exist, 7 others to be completed by project, three remaining to be completed by the contractor); Indicator 2.2 : In a survey, 16/30 stakeholders from Water Supply and Sanitation Authorities (WSSAs) and the MoW confirm the use of the gender-sensitive expert database in the development of JTPs, Water Safety Plans, and priority projects to improve access to climate-resilient water supply and sanitation services (16 positive responses). In addition, Module Objective Indicator 3 is as follows, "Water catchment authorities (3 total) have developed an evidence-based gender-sensitive Water Allocation Plan (WAP) in each selected sub-catchment (3 sub-catchments), based on current, climate-resilient hydrological data." Work Package 1 relates to Output 2 and the two corresponding indicators. Work Package 2 relates to Module Objective Indicator 3. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHN/A
Technical advisory services on the development of the National Health Insurance scheme in Nepal
Nepal has made significant progress in improving the overall health status of the population, with huge improvements in life expectancy and reductions in maternal and child mortality rates. However, access to quality healthcare remains unequal, as many citizens face barriers due to geography, socio-economic status, and economic constraints. Nepal National Health Accounts (NHA) report indicates that out-of-pocket (OOP) healthcare expenses accounted for 54.2% of total health spending in 2019/20, exceeding the South Asian average of 48.2% (WHO 2023). Government contributions to health expenditure are only 30%, which is lower than the regional average of 42% (WHO GHED 2023). A 2018 study found that 10.3% of households faced catastrophic health expenditures monthly (Ghimire et al. 2018). Furthermore, the report found that 10.7% of households spent 10% of their total household expenditure on health and 2.4% even spent 25%, implying that Nepalese households face increased vulnerability to catastrophic health expenditures risking impoverishment (ADB 2024). To achieve Universal Health Coverage (UHC), Nepal seeks to reduce OOP spending through the National Health Insurance (NHI), launched in 2016. This initiative, overseen by the Health Insurance Board (HIB), aims to provide universal access to quality health services, primarily for the informal sector. Currently, the NHI is operational in all 753 local structures across 77 districts. Though the Health Insurance Act 2017 has clearly mentioned the health insurance to be mandatory, in practice this is not yet enforced; highlighted by the fact that out of 8.1 million ever-enrolled, currently only 4.4 are actively insured as of June 2024. The increasing coverage and expansion of the NHI is a priority to the Government of Nepal (GoN) and strengthening the institution has been identified as an important action area within the strategies in both the National Health Financing Strategy (NHFS) 2022-2032 and in the National Health Sector Strategic Plan (NHSSP) 2022-2030. GIZ has been supporting the national health insurance program since 2013, on policy advisory aspects as well as technical aspects. To strengthen HIB, GIZ supported a pool of experts through the Support to Health Sector Strategy (S2HSS) program in 2023. The pool of experts supported in defining roles and responsibilities of the policy, planning and monitoring department (PPMD) and developing job descriptions for those assigned to the departments, as envisioned in the Organisation and Management (O&M) survey. In addition, the support was extended for development of crucial policy documents, strategies, guidelines, and plans. On a technical front, GIZ supported HIB for improving the open-source insurance management information system (openIMIS) to streamline core business processes: from enrollment, member verification, policy activation to claims processing and reimbursement. Meanwhile, in the current context of HIB with constrained institutional capacity despite having developed numerous strategic documents in 2023, prioritizing its execution along with implementation of necessary reforms is now critical. Additionally, increasing population coverage, contextually redefining the benefit package, enhanced claims processing, strategic purchasing, actuarial analysis for decision modelling, using data analytics for enhancing quality of care and coordination with other actors like the Social Security Fund (SSF), Employee"s Provident Fund (EPF) etc. is vital to improve efficiency and avoid redundancy in successful implementation of the health insurance program. In order to address these policy, strategy and operational level challenges, GIZ calls for a team of nine short-term and long-term experts with diverse expertise for building up the health insurance to strengthen the institutional capacities of the HIB and other social protection actors to implement the national health insurance program in Nepal. The team will consist of 2 international experts on organizational management and health insurance, 1 short-term national senior expert on health insurance, 4 national short-term experts (covering the topics insurance law, health economics, quality management and actuary analysis) and 2 national long-term experts (health economist and Monitoring & Evaluation specialist). The contract shall be managed and overseen by an international team leader and supported by a national team leader. The period of assignment of the contract will be 01 April 2025 to 31 March 2026. The tasks to be performed by the contractor have been briefly listed in the following four work packages: Work package 1: Support HIB in setting the normative and strategic structure and functions for refining the health insurance program, especially related to financial sustainability aspects. Work package 2: Harmonization of procedures and service packages of national health insurance program and other programs offering benefits in the event of illness. Work package 3: Organizational and institutional capacity development measures to improve core processes of the health insurance program. Work package 4: Provide advice to HIB on various technical matters, focusing on use of data, data analysis, evidence-based planning, and quality management. By the end of the contractual period, the experts need to develop five strategy papers relating to the financial sustainability of the national health insurance scheme, and adequately capacitate the health insurance board for major policy reforms as well as for efficiently enhanced operational functions of the program. The contractor should conduct workshops, meetings, policy dialogues etc. for the purpose. For further details on the tender, including detailed specifications of the experts, work packages and other considerations, please refer to the Terms of reference. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
Technical advisory services on the development of the National Health Insurance scheme in Nepal
Nepal has made significant progress in improving the overall health status of the population, with huge improvements in life expectancy and reductions in maternal and child mortality rates. However, access to quality healthcare remains unequal, as many citizens face barriers due to geography, socio-economic status, and economic constraints. Nepal National Health Accounts (NHA) report indicates that out-of-pocket (OOP) healthcare expenses accounted for 54.2% of total health spending in 2019/20, exceeding the South Asian average of 48.2% (WHO 2023). Government contributions to health expenditure are only 30%, which is lower than the regional average of 42% (WHO GHED 2023). A 2018 study found that 10.3% of households faced catastrophic health expenditures monthly (Ghimire et al. 2018). Furthermore, the report found that 10.7% of households spent 10% of their total household expenditure on health and 2.4% even spent 25%, implying that Nepalese households face increased vulnerability to catastrophic health expenditures risking impoverishment (ADB 2024). To achieve Universal Health Coverage (UHC), Nepal seeks to reduce OOP spending through the National Health Insurance (NHI), launched in 2016. This initiative, overseen by the Health Insurance Board (HIB), aims to provide universal access to quality health services, primarily for the informal sector. Currently, the NHI is operational in all 753 local structures across 77 districts. Though the Health Insurance Act 2017 has clearly mentioned the health insurance to be mandatory, in practice this is not yet enforced; highlighted by the fact that out of 8.1 million ever-enrolled, currently only 4.4 are actively insured as of June 2024. The increasing coverage and expansion of the NHI is a priority to the Government of Nepal (GoN) and strengthening the institution has been identified as an important action area within the strategies in both the National Health Financing Strategy (NHFS) 2022-2032 and in the National Health Sector Strategic Plan (NHSSP) 2022-2030. GIZ has been supporting the national health insurance program since 2013, on policy advisory aspects as well as technical aspects. To strengthen HIB, GIZ supported a pool of experts through the Support to Health Sector Strategy (S2HSS) program in 2023. The pool of experts supported in defining roles and responsibilities of the policy, planning and monitoring department (PPMD) and developing job descriptions for those assigned to the departments, as envisioned in the Organisation and Management (O&M) survey. In addition, the support was extended for development of crucial policy documents, strategies, guidelines, and plans. On a technical front, GIZ supported HIB for improving the open-source insurance management information system (openIMIS) to streamline core business processes: from enrollment, member verification, policy activation to claims processing and reimbursement. Meanwhile, in the current context of HIB with constrained institutional capacity despite having developed numerous strategic documents in 2023, prioritizing its execution along with implementation of necessary reforms is now critical. Additionally, increasing population coverage, contextually redefining the benefit package, enhanced claims processing, strategic purchasing, actuarial analysis for decision modelling, using data analytics for enhancing quality of care and coordination with other actors like the Social Security Fund (SSF), Employee"s Provident Fund (EPF) etc. is vital to improve efficiency and avoid redundancy in successful implementation of the health insurance program. In order to address these policy, strategy and operational level challenges, GIZ calls for a team of nine short-term and long-term experts with diverse expertise for building up the health insurance to strengthen the institutional capacities of the HIB and other social protection actors to implement the national health insurance program in Nepal. The team will consist of 2 international experts on organizational management and health insurance, 1 short-term national senior expert on health insurance, 4 national short-term experts (covering the topics insurance law, health economics, quality management and actuary analysis) and 2 national long-term experts (health economist and Monitoring & Evaluation specialist). The contract shall be managed and overseen by an international team leader and supported by a national team leader. The period of assignment of the contract will be 01 April 2025 to 31 March 2026. The tasks to be performed by the contractor have been briefly listed in the following four work packages: Work package 1: Support HIB in setting the normative and strategic structure and functions for refining the health insurance program, especially related to financial sustainability aspects. Work package 2: Harmonization of procedures and service packages of national health insurance program and other programs offering benefits in the event of illness. Work package 3: Organizational and institutional capacity development measures to improve core processes of the health insurance program. Work package 4: Provide advice to HIB on various technical matters, focusing on use of data, data analysis, evidence-based planning, and quality management. By the end of the contractual period, the experts need to develop five strategy papers relating to the financial sustainability of the national health insurance scheme, and adequately capacitate the health insurance board for major policy reforms as well as for efficiently enhanced operational functions of the program. The contractor should conduct workshops, meetings, policy dialogues etc. for the purpose. For further details on the tender, including detailed specifications of the experts, work packages and other considerations, please refer to the Terms of reference. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
Development of a green corridor project and street design training in Dakar
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, g - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHN/ADeadline: Aug 11
Scaling Up Implementation and Institutional Capacity for Energy Management Systems (EnMS) in Pakistan
Description of services to be provided for EU publication Technical assistance (including short-term expert pool) for Private Sector Development in Ethiopia This tender concerns the provision and management of expert services to support the implementation of the Private Sector Development in Ethiopia (PSD-E) programme implemented by GIZ. The PSD-E programme aims to strengthen the competitiveness and resilience of Ethiopia"s private sector in the transition towards a market-friendly economy. The programme is commissioned by the German Federal Ministry for Economic Cooperation and Development (BMZ), co-financed by the European Union (EU) and the Netherlands" Minister for Foreign Trade and Development Cooperation, and implemented by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. It works with key public institutions, private sector stakeholders and sub-national actors to address structural constraints to enterprise growth and economic transformation. Services will be delivered through a national long-term expert and a pool of national and international short-term experts. They will provide technical and administrative support to the EU-cofinanced output "Modernise and Harmonise Ethiopia"s Tax Administration and Customs Management Systems for Private Sector Growth." - Specific Objective 1: Enhance transparent, proactive and accountable domestic tax administration systems in Ethiopia with better understanding and service to private sector operators in critical value chains. - Specific Objective 2: Enhance cross-border trade facilitation through optimized electronic customs management and valuation systems and efficient customs services that leverage digital means. The contractor will support project implementation across six output areas: 1. Modernisation of domestic tax audit systems - Support the introduction of digital tools, advanced analytics and risk-based methodologies (including AI-supported and computer-assisted audit techniques). - Deliver capacity development for tax officials (training, mentoring, peer learning, coaching). - Support tax administration reforms through assessments, alignment with TADAT priorities, and facilitation of international cooperation. 2. Harmonisation of domestic tax administration - Strengthen tax regulatory frameworks and promote harmonisation between federal and regional tax authorities. - Support tax reform agendas, including monitoring tools and alignment with international tax standards (e.g. BEPS, Pillar 1 and 2). - Support digital transformation of tax administration and improvements in service delivery, including roll-out of Integrated Company Creation Journey (ICCJ). 3. Strengthening tax dispute resolution - Improve procedures, coordination mechanisms and legal frameworks at federal and regional level. - Support the preparation of digital dispute management tools (e.g. case management, tracking, early dispute prevention mechanisms such as rulings and APAs). - Strengthen institutional capacity and taxpayer awareness through training and outreach. 4. Upgrading customs management and valuation systems - Support the preparation and introduction of digital customs tools such as the Electronic Customs Valuation System (e-ECVS), Electronic Single Window (e-SW) and trade portals. - Strengthen coordination and preconditions for interoperability and data exchange among customs and other trade regulatory bodies, including the once-only principle. - Provide technical assistance through process mapping, legal and procedural reviews, training and peer exchanges. 5. Strengthening human capacity in customs administration - Design and implement a national customs capacity development programme, including training needs assessments and standardised training modules. - Deliver training-of-trainers, nationwide training programmes and e-learning modules on selected customs procedures. - Facilitate structured dialogue and targeted training for traders, customs brokers and logistics operators. 6. Improving external trade statistics and market intelligence - Harmonise regulatory frameworks and upgrade procedures for trade data collection, management and analysis in line with international standards. - Strengthen institutional capacities through training, development of standard operating procedures and professionalisation of trade data management. - Support improved access to trade data and development of analytical tools and market intelligence services for key value chains. Cross-cutting activities - Support programme communication activities. Tasks of the pool manager - Manage two short-term expert pools (administration, finance, budgeting, reporting, monitoring and quality assurance). - Organise conferences, workshops, events and training activities. All outputs (e.g. reports, studies, analyses, strategies and training materials) must be delivered in English. Trainings conducted in the regions may require local languages. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
Scaling Up Implementation and Institutional Capacity for Energy Management Systems (EnMS) in Pakistan
Description of services to be provided for EU publication Technical assistance (including short-term expert pool) for Private Sector Development in Ethiopia This tender concerns the provision and management of expert services to support the implementation of the Private Sector Development in Ethiopia (PSD-E) programme implemented by GIZ. The PSD-E programme aims to strengthen the competitiveness and resilience of Ethiopia"s private sector in the transition towards a market-friendly economy. The programme is commissioned by the German Federal Ministry for Economic Cooperation and Development (BMZ), co-financed by the European Union (EU) and the Netherlands" Minister for Foreign Trade and Development Cooperation, and implemented by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. It works with key public institutions, private sector stakeholders and sub-national actors to address structural constraints to enterprise growth and economic transformation. Services will be delivered through a national long-term expert and a pool of national and international short-term experts. They will provide technical and administrative support to the EU-cofinanced output "Modernise and Harmonise Ethiopia"s Tax Administration and Customs Management Systems for Private Sector Growth." - Specific Objective 1: Enhance transparent, proactive and accountable domestic tax administration systems in Ethiopia with better understanding and service to private sector operators in critical value chains. - Specific Objective 2: Enhance cross-border trade facilitation through optimized electronic customs management and valuation systems and efficient customs services that leverage digital means. The contractor will support project implementation across six output areas: 1. Modernisation of domestic tax audit systems - Support the introduction of digital tools, advanced analytics and risk-based methodologies (including AI-supported and computer-assisted audit techniques). - Deliver capacity development for tax officials (training, mentoring, peer learning, coaching). - Support tax administration reforms through assessments, alignment with TADAT priorities, and facilitation of international cooperation. 2. Harmonisation of domestic tax administration - Strengthen tax regulatory frameworks and promote harmonisation between federal and regional tax authorities. - Support tax reform agendas, including monitoring tools and alignment with international tax standards (e.g. BEPS, Pillar 1 and 2). - Support digital transformation of tax administration and improvements in service delivery, including roll-out of Integrated Company Creation Journey (ICCJ). 3. Strengthening tax dispute resolution - Improve procedures, coordination mechanisms and legal frameworks at federal and regional level. - Support the preparation of digital dispute management tools (e.g. case management, tracking, early dispute prevention mechanisms such as rulings and APAs). - Strengthen institutional capacity and taxpayer awareness through training and outreach. 4. Upgrading customs management and valuation systems - Support the preparation and introduction of digital customs tools such as the Electronic Customs Valuation System (e-ECVS), Electronic Single Window (e-SW) and trade portals. - Strengthen coordination and preconditions for interoperability and data exchange among customs and other trade regulatory bodies, including the once-only principle. - Provide technical assistance through process mapping, legal and procedural reviews, training and peer exchanges. 5. Strengthening human capacity in customs administration - Design and implement a national customs capacity development programme, including training needs assessments and standardised training modules. - Deliver training-of-trainers, nationwide training programmes and e-learning modules on selected customs procedures. - Facilitate structured dialogue and targeted training for traders, customs brokers and logistics operators. 6. Improving external trade statistics and market intelligence - Harmonise regulatory frameworks and upgrade procedures for trade data collection, management and analysis in line with international standards. - Strengthen institutional capacities through training, development of standard operating procedures and professionalisation of trade data management. - Support improved access to trade data and development of analytical tools and market intelligence services for key value chains. Cross-cutting activities - Support programme communication activities. Tasks of the pool manager - Manage two short-term expert pools (administration, finance, budgeting, reporting, monitoring and quality assurance). - Organise conferences, workshops, events and training activities. All outputs (e.g. reports, studies, analyses, strategies and training materials) must be delivered in English. Trainings conducted in the regions may require local languages. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 11
Scaling Up Implementation and Institutional Capacity for Energy Management Systems (EnMS) in Pakistan
Description of services to be provided for EU publication Technical assistance (including short-term expert pool) for Private Sector Development in Ethiopia This tender concerns the provision and management of expert services to support the implementation of the Private Sector Development in Ethiopia (PSD-E) programme implemented by GIZ. The PSD-E programme aims to strengthen the competitiveness and resilience of Ethiopia"s private sector in the transition towards a market-friendly economy. The programme is commissioned by the German Federal Ministry for Economic Cooperation and Development (BMZ), co-financed by the European Union (EU) and the Netherlands" Minister for Foreign Trade and Development Cooperation, and implemented by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. It works with key public institutions, private sector stakeholders and sub-national actors to address structural constraints to enterprise growth and economic transformation. Services will be delivered through a national long-term expert and a pool of national and international short-term experts. They will provide technical and administrative support to the EU-cofinanced output "Modernise and Harmonise Ethiopia"s Tax Administration and Customs Management Systems for Private Sector Growth." - Specific Objective 1: Enhance transparent, proactive and accountable domestic tax administration systems in Ethiopia with better understanding and service to private sector operators in critical value chains. - Specific Objective 2: Enhance cross-border trade facilitation through optimized electronic customs management and valuation systems and efficient customs services that leverage digital means. The contractor will support project implementation across six output areas: 1. Modernisation of domestic tax audit systems - Support the introduction of digital tools, advanced analytics and risk-based methodologies (including AI-supported and computer-assisted audit techniques). - Deliver capacity development for tax officials (training, mentoring, peer learning, coaching). - Support tax administration reforms through assessments, alignment with TADAT priorities, and facilitation of international cooperation. 2. Harmonisation of domestic tax administration - Strengthen tax regulatory frameworks and promote harmonisation between federal and regional tax authorities. - Support tax reform agendas, including monitoring tools and alignment with international tax standards (e.g. BEPS, Pillar 1 and 2). - Support digital transformation of tax administration and improvements in service delivery, including roll-out of Integrated Company Creation Journey (ICCJ). 3. Strengthening tax dispute resolution - Improve procedures, coordination mechanisms and legal frameworks at federal and regional level. - Support the preparation of digital dispute management tools (e.g. case management, tracking, early dispute prevention mechanisms such as rulings and APAs). - Strengthen institutional capacity and taxpayer awareness through training and outreach. 4. Upgrading customs management and valuation systems - Support the preparation and introduction of digital customs tools such as the Electronic Customs Valuation System (e-ECVS), Electronic Single Window (e-SW) and trade portals. - Strengthen coordination and preconditions for interoperability and data exchange among customs and other trade regulatory bodies, including the once-only principle. - Provide technical assistance through process mapping, legal and procedural reviews, training and peer exchanges. 5. Strengthening human capacity in customs administration - Design and implement a national customs capacity development programme, including training needs assessments and standardised training modules. - Deliver training-of-trainers, nationwide training programmes and e-learning modules on selected customs procedures. - Facilitate structured dialogue and targeted training for traders, customs brokers and logistics operators. 6. Improving external trade statistics and market intelligence - Harmonise regulatory frameworks and upgrade procedures for trade data collection, management and analysis in line with international standards. - Strengthen institutional capacities through training, development of standard operating procedures and professionalisation of trade data management. - Support improved access to trade data and development of analytical tools and market intelligence services for key value chains. Cross-cutting activities - Support programme communication activities. Tasks of the pool manager - Manage two short-term expert pools (administration, finance, budgeting, reporting, monitoring and quality assurance). - Organise conferences, workshops, events and training activities. All outputs (e.g. reports, studies, analyses, strategies and training materials) must be delivered in English. Trainings conducted in the regions may require local languages. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
Development of a green corridor project and street design training in Dakar
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 10. September 2026.
- Who is the contracting authority?
- The contracting authority is European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.