Institutt for energiteknikkKjellerTED
Framework agreement outside work
IFE NUK intends to enter into a contract with a tenderer for various outside work. The works can consist of, for example, maintenance such as snow clearing and gritting in winter and lawn cutting in the summer. Any major projects will be implemented as a new competition.
Winter Service, Green-Space Maintenance
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Institutt for energiteknikk
- Published:
- June 14, 2026
- Deadline:
- August 20, 2026
- Topic:
- Winter Service
Tender description
IFE NUK intends to enter into a contract with a tenderer for various outside work. The works can consist of, for example, maintenance such as snow clearing and gritting in winter and lawn cutting in the summer. Any major projects will be implemented as a new competition.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Framework agreement, winter operations
Drammen Eiendom KFDrammenDeadline: Jul 01Drammen Eiendom KF would like to enter into a framework agreement for snow clearing and gritting on its properties. The assignments include snow removal by machine, gritting with machinery, shovelling, hand milling, manual gritting and filling of coats. The services also apply for all out/entrances, emergency exits to the buildings, external steps and recycling points/garbage cans, as well as everything stated on the maps. The procurement shall also include snow clearing on roofs if needed. DEKF would like to be free to place orders here.Office Supplies - Framework Agreement
Institutt for energiteknikkKjellerDeadline: Jul 10IFE NUK intends to enter into a framework agreement for the delivery of office supplies. The procurement includes i.a. daily office supplies, paper, various types of office accessories as well as cleaning articles for use in the Contracting Authority's premises. The list is not exhaustive and the framework agreement can also be used for the procurement of other products within the agreed assortment and the contract ́s frameworks. A complete description of the contract works is in the requirement specifications in the contract Annex 1 and the price form in Annex 3.Framework agreement - Plenary cutting cemetarys and municipal area 2026-2029
Herøy municipalityFosnavågProcured debt lawn cutting by Herøy municipality and Herøy church council ́s lawns as specified in the price form and attached map. The requirements for carrying out the assignment are seen in the requirement specifications. The tenderer called the requirement specifications for further description of the delivery.135-BYM-2023 Parallel framework agreements for construction work
Oslo kommune v/ BymiljøetatenOsloThe Agency for Urban Environment intends to enter into a framework agreement for site work covering its entire management area. The work includes construction on, along, and in roads, as well as ground and surface works in urban areas, parks, footpaths, sports facilities, etc. This framework is in addition to separate tender contests for upgrading roads, squares, and meeting places.Framework agreement - Carpentry services
Sarpsborg kommuneSarpsborgSarpsborg municipality mainly has a need for the following joinery services. Carpentry Carpentry work. The work mainly includes repairs and improvements in connection with the operation and maintenance of typical joinery/carpentry work as well as some new installations within the discipline.Albertatunet K2 -Sealed house, fixed fixtures including technical disciplines and outside work.
Kinn kommuneMåløyKinn municipality would like to enter into a contract with a contractor for dense building and fitting works, including technical disciplines, as well as outdoor work for the planned welfare building, Albertatunet. In addition reconstruction of roads including electro and W&S works around Albertatunet shall also be carried out in this contract. Albertatunet is a planned welfare building in the centre of Florø, which shall contain 100 institution sites, a new base for the home care services, emergency doctor surgery, day activity shelter as well as training/rehabilitation premises and cafè. There will be a workplace for a total of 150-200 employees, and the building shall be designed in accordance with husbanken ́s requirements for institution sites and day activities. The construction project shall be carried out in two subsequent execution contracts K1 and K2, as well as K3 and K4 that transport contracts according to the following division: - K1: Ground works, water and sewage works, frameworks including foundations (ongoing) - K2: Sealed houses and fixtures (fixed), technical disciplines and outdoor work + road works. - K3: Back-up power supply (shall be transported to K2) - K4: Lifts (shall be transported to K2) Mobile fixtures and equipment are divided into several procurements in later phases.Framework agreement for asphalt works, operation and maintenance.
Bodø KommuneBODØDeadline: Jul 31The aim of the procurement is to enter into a framework agreement with one tenderer for the delivery and laying of asphalt on municipal roads and areas in Bodø municipality. The contract shall ensure the delivery of asphalt work as a comprehensive service, including all necessary work, including preparatory works, asphalting, compaction and clearing up after work has been carried out. The framework agreement will be valid for 2 years, with an option to extend the framework agreement for a further 1+1 year, to a total maximum of four years. The estimated value of the framework agreement is between NOK 28 million and NOK 29 million excluding VAT per annum. This is equivalent to between NOK 112 million and NOK 116 million excluding VAT for the entire contract period of maximum four years (including options). The maximum financial limit for the framework agreement (including options) is NOK 150 million excluding VAT. See the requirement specifications, point 2.2 part 2 and annex 1 for further information on the contract's extent and content.Framework agreement for joinery works - second publication
Sola kommuneSolaDeadline: Jun 22The framework agreement mainly includes repairs and replacements on the Contracting Authority's buildings and sites, as well as planning and minor engineering design work connected to the assignments.MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Transport Infrastructure Ireland (TII)DublinDeadline: Jul 13The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will consist of call-off contracts for large elements of civils works, which may include station boxes, tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for the Glasnevin station retaining wall (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information.FRAMEWORK AGREEMENT FOR THE PROCUREMENT OF SNOW CLEARING SERVICES
Grimstad kommuneGrimstadDeadline: Aug 12Grimstad municipality shall enter into a framework agreement with several tenderers for winter maintenance; snow ploughing, gritting and clearing snow and ice on municipal roads and open spaces, as well as setting out snow stakes. The framework agreement is divided into three parallel sub-contracts divided in accordance with machine types: tractors, small wheel loaders (4-8 tons) and large wheel loaders (8-16 tons). This notice concerns snow clearing areas of roads, as well as clearing areas for municipal purpose-built buildings. Tenderers shall not submit tender offers on specific routes, it is the contracting authority who will award the routes after the tender deadline has expired. The expected tenderers will have route maps distributed in a reasonable time before the snow clearing season. As the areas are dynamic and changes can occur, the routes will be divided according to a total assessment of the following criteria: the machine ́s suitability, efficient operations planning and cost-benefit connected to geographical location and costs of moving around. The contracting authority always aims to divide the sections so that they generate approx. as many hours. Changes must be expected in the routes, but will be agreed further per season. Tenderers must reckon on clearing areas within the entire municipality. During the agreement period there will be a need for occasional snow clearing in accordance with the contracting authority ́s needs. Tenderers must therefore reckon on extra assignments beyond the routes. A previous route overview and a map of roads and institutions are attached together with the tender documentation (Annexes 1, 2 and 3). These are outdated and new areas are under revision. Tenderers must expect changes to the extent of individual routes. See Annex 1 Requirement Specifications for further information on the procurement.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 20. August 2026.
- Who is the contracting authority?
- The contracting authority is Institutt for energiteknikk.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.