IÉ are currently in the process of constructing a new Rail Link between Limerick and Foynes Port. In support of the operational requirements of the Line, IE Telecoms along with IE Signalling Colleagues are constructing a Cable Route System. Multiple loose tube fibre optic cables of varying count, primarily 96 and 24, shall be installed be...
No credit card · Instant access
Content at a glance
IÉ are currently in the process of constructing a new Rail Link between Limerick and Foynes Port. In support of the operational requirements of the Line, IE Telecoms along with IE Signalling Colleagues are constructing a Cable Route System. Multiple loose tube fibre optic cables of varying count, primarily 96 and 24, shall be installed...
- Tender type:
- Tender
- Contracting authority:
- Iarnród Eireann-Irish Rail
- Published:
- February 15, 2026
- Deadline:
- Not specified
Tender description
IÉ are currently in the process of constructing a new Rail Link between Limerick and Foynes Port. In support of the operational requirements of the Line, IE Telecoms along with IE Signalling Colleagues are constructing a Cable Route System. Multiple loose tube fibre optic cables of varying count, primarily 96 and 24, shall be installed between Limerick and Foynes to support the operational Line and the National Telecoms Network as part of the project.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
6- Iarnród Eireann-Irish RailDublin
Construction of Three Rail Overbridges on the Limerick to Foynes Railway Line
The proposed contract is for construction of three ‘employer designed’ rail overbridges on the Limerick to Foynes Railway Line, as advance works for the overall 35km long Foynes to Limerick Road (including Adare Bypass) scheme which will provide improved connectivity between Foynes Port and Limerick. The proposed rail overbridges interface with Ianród Éireann’s live project to reopen the Limerick-Foynes rail line for freight services, due for completion in late 2025 - RARIK ohf.ReykjavíkDeadline: Apr 16
CABLE PLOUGHING - STRENGLÖGN - LAUGARBAKKI - VÍÐIGERÐI
Rarik ohf. invites tenders for the project Cable Ploughing - Strenglögn - Laugarbakki - Víðigerði no. 26010. The project involves the installation of a 36 kV high-voltage cable together with a 20 mm fibre-optic duct along an approximately 16 km route. Of this total distance, about 2 km is expected to require trench excavation, where four additional cables will be installed along the same section. The works shall commence on 22 June and be completed by 31 August 2026. - Limerick City and County Council_103432Limerick.Deadline: Apr 20
Colbert Quarter, Limerick - Multi-Disciplinary (Project Management, Cost Management and Design Team) Design Team Services – Specified Infrastructure Works Packages
Limerick City and County Council's , Colbert Quarter Infrastructure Delivery Office are seeking submissions for the provision of Multi-Disciplinary (Project Management, Cost Management and Design Team) Services for the delivery of the Colbert Quarter , Specified Infrastructure Works Packages. The Colbert Quarter Project aims to deliver a landmark, large-scale mixed-use project in Limerick City Centre. Project Description The Specified Infrastructure Works (SIW) packages will support and facilita - FOLD Housing Association IrelandDublinDeadline: Mar 13
Provision of ICT Managed Service for Fold Housing
The objective of this RFT is to appoint a qualified ICT Managed Service Provider (MSP) to provide Level 1, Level 2 and Level 3 support for all of the Contracting Authority’s ICT systems and equipment in line with ITIL v4 best practices. The MSP will be responsible for ensuring operational efficiency, service continuity and user satisfaction for Fold's 130 users using PCs/laptops/mobile for access to M365 and SharePoint services. 300mm fully automated high resolution in-line CD and overlay (IZM-133.1) - PR1191754-3460-P
1 piece: 300mm fully automated high resolution in-line CD and overlay (IZM-133.1) The following equipment specification defines the requirements for a fully automated metrology tool to measure overlay and critical dimension (CD) structures on 300 mm and 200 mm wafers, produced using laser direct imaging (LDI) and i-line lithography. This investment expands the metrology capability for automated measurement of smaller feature sizes. The tool is essential for non-destructive characterization of highly integrated, chiplet-based 2.5D/3D and quasi-monolithic package architectures with sub-micrometer feature sizes. The equipment is compatible with 3D wafer stacks exhibiting high warp/bow. Wafer substrates are silicon and/or glass, with thicknesses up to 2.5 mm. Before processing, wafers are delivered to the tool in front-opening unified pods (FOUPs), which the operator manually places on the respective load ports. The new tool must be able to perform the following sequence of steps fully automatically: - Load designated wafers from the FOUP(s) - Execute metrology tasks - Return wafers to their original positions in the FOUP(s) Recipe programming must support a sufficiently wide range of options and parameters to meet research and development (R&D) needs. It is required that the equipment continuously performs the intended functions without interruptions or failures, in accordance with all requirements specified in this document. Furthermore, the equipment must be supplied with all items described below that are necessary for it to deliver the intended functions and capabilities in compliance with all requirements set out in this document.- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
81322610-Appui technique à la conservation de la biodiversité et au bien-être des populations en Côte d'Ivoire
GIZ is seeking to contract an international service provider to deliver "Technical support for bio-diversity conservation and the well-being of populations in Côte d'Ivoire". The contracting party will be in charge of achieving the following four major outputs : The service provider will be responsible for implementing output 1 in the Bossématié region. To improve regional planning and management of natural resources, it will support the establishment of a multi-stakeholder platform and provide technical assistance. To ensure the sustainability of the action, the platform will be managed by a local decentralized authority such as the Indénié-Djuablin region. The contracting party will also provide support for the Regional Council of Indénié-Djuablin in natural resource management planning. To achieve this, structuring activities, such as the participative preparation of a land-use plan (spatial plan with land use, monitoring of forest cover etc.), the operational development planning (aka "green planning") and the implementation of a geoportal, at regional and/or departmental level, will be focused. On a local level, the service provider will assist communities and local authorities in the process of implementing local agreements in areas bordering the Bossématié nature reserve. Local agreements will be a key element in the sustainable management of natural resources and the protection of biodiversity. Once they have been negotiated, action plans will be drawn up, which will provide a framework for all measures implemented with the support of the project, particularly in the areas of agriculture, biodiversity and reforestation. Regarding output 2 "Management of protected areas", the service provider will strengthen capacities of the conservation authority OIPR to improve their biomonitoring and surveillance systems, climate change adaptation, complaints management procedures and management of marine protected areas. Furthermore, local authorities, public institutions and private individuals will be supported in their efforts to preserve forests or Other Effective Area-based Conservation Measures (OECM). This includes the creation of voluntary nature reserves and ecological corridors between protected areas and other natural or semi-natural areas. While the activities in favour of the reinforcement of ecological connectivity are limited to the Bossématié region, assistance to OIPR will be provided in all project regions. The service provider will also implement output 3 "Agroecological innovations and agroforestry" in the Bossématié region. In order to establish agroecological production systems, it will first provide technical support to local communities in identifying and developing agroecological production sites. Thereafter, the service provider will design and implement an extensive program of awareness-raising and technical and organizational capacity-building to launch agroeco-logical production in these selected sites and to promote agroecological processing. Emphasis will be placed on the interests of women and women's cooperatives. The contracting party will also support the development of agroforestry in rural communities in the Bossématié area. By responding to the need for reforestation, agroforestry rehabilitation of riverbanks, income diversification, improved soil fertility and zero deforestation cocoa farming, this package will build the technical capacity of farmers and local service providers in terms of agroforestry innovations. Contributing to output 4, the service provider will strengthen the capacities of regional and national actors in terms of biodiversity protection. In collaboration with relevant state entities, it will provide specialised expertise to communities and forest or reserve managers to help them leverage biodiversity and climate finance mechanisms such as payments for ecosystem services (PES), carbon markets or the Green Climate Fund. To do so, the feasibility of PES projets is evaluated and technical guidance is provided to project owners throughout all stages of project development, up to the finalisation of financing agreements. Furthermore, the service provider will assist relevant state institutions to implement and monitor the NDCs in the AFOLU sector and to further operationnalize the existing agroforestry MRV system, including the dissemination of emission reduction results on the dedicated platform.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Iarnród Eireann-Irish Rail.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.