Gaffney and Cullivan Architects ltdCavanTED
Extension of the Potting Shed and change of use to artists' studios, associated external works and internal alterations to the dance studio.
The works will comprise of alterations to existing Potting Sheds and change of use to Artist's Studios. Works will include an increase in floor area, alterations to the floor plan and elevations, development of a ramp access, canopy and alterations to the external staircase to the tower. Also pergola/ramp link between Potting Sheds and Da...
Timber Construction, Roofing, Facades & Plastering, Electrical Installation, Non-Residential Building
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Gaffney and Cullivan Architects ltd
- Published:
- August 23, 2026
- Deadline:
- September 21, 2026
- Topic:
- Timber Construction
- Object:
- Kultur- / Veranstaltungsgebäude
Object classification
- Kultur- / VeranstaltungsgebäudePrimary
Tender description
The works will comprise of alterations to existing Potting Sheds and change of use to Artist's Studios. Works will include an increase in floor area, alterations to the floor plan and elevations, development of a ramp access, canopy and alterations to the external staircase to the tower. Also pergola/ramp link between Potting Sheds and Dance Studio and internal alterations to Dance Studio. All to include external works and connections/alterations to site services and all associated site works.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
4View CfT Workspace
Gaffney and Cullivan Architects ltdDeadline: Aug 20The works will comprise of alterations to existing Potting Sheds and change of use to Artist's Studios. Works will include an increase in floor area, alterations to the floor plan and elevations, development of a ramp access, canopy and alterations to the external staircase to the tower. Also pergola/ramp link between Potting Sheds and Dance Studio and internal alterations to Dance Studio. All to include external works and connections/alterations to site services and all associated site works.Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare – Extension, Refurbishment, Heating System Upgrade and Associated Site Works
CorlannClarinbridgeDeadline: Sep 02The proposed works comprise the construction of a new single-storey extension and associated refurbishment and alteration works to an existing community dwelling at Carra Mor Community Dwelling, Lifford, Ennis, Co. Clare (V95 Y4A6). The project includes the construction of a new extension incorporating an accessible assisted bathroom, accessible ensuite, equipment room, storage room and connecting corridor. Internal refurbishment works include the conversion of existing shared sanitary facilities into six individual ensuites, construction of a new sluice room, widening of internal door openings, fire door upgrades, and associated alterations to plumbing, drainage, ventilation, electrical and fire alarm systems. External works comprise the construction of a new galvanised steel bus canopy with laminated glazed roof, reinforced concrete hardstanding, relocation of existing parking spaces, new kerb works, foul and surface water drainage alterations, soakaway, landscaping reinstatement and all associated site development works. The contract also includes a comprehensive upgrade of the existing heating and domestic hot water installation, including the removal of the existing oil-fired plant and the installation of a new external high-efficiency condensing oil boiler, new twin-coil hot water cylinder, circulating pumps, heating controls, plantroom modifications, associated electrical works, and extension of the heating system to serve the new accommodation. The Contractor shall provide all labour, materials, plant, temporary works, testing, commissioning, certification, operation and maintenance manuals, and all ancillary works necessary to deliver a complete, fully operational facility in accordance with the drawings, specifications and contract documents.Restoration and Extension of Stone Cottage, Demolition of Two Stone Outbuildings, and Installation of New WWTS
John J. O'Sullivan and AssoicatesGlengarriffDeadline: Aug 171. The works consist of - Demolition of stone shed and block lean-to extension. - Refurbishment of old stone cottage – the cottage requires a new ground bearing floor slab and a new roof, the existing rubble stone walls will have to be raked out and repointed on the outside and plastered with insulating lime based plaster on the inside. The cottage needs all new windows and doors and full internal fitout. - Construction of a new 64m2 single storey extension - External site works – all site drainage and construction of a patio - Construction of a new Waste Water Treatment SystemRefurbishment of existing municipal building to 2 number apartment units, and a rear first floor extension and all associated works.58 Mayorstone Drive Limerick.
Limerick City and County Council_103432Limerick.Deadline: Sep 09This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposed
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 21. September 2026.
- Who is the contracting authority?
- The contracting authority is Gaffney and Cullivan Architects ltd.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.