CEIST (Catholic Education an Irish Schools Trust)NaasTED
Enabling Works Nr. 2 at Sacred Heart Secondary School, Convent Road, Clonakilty, Co. Cork
Preparatory construction activities required to support the installation of new roof trusses, internal upgrades, and associated structural, mechanical, and safety works within an operational school environment. The scope includes construction, demolition, temporary works, utility coordination, and safe access management.
Timber Construction, Roofing, Dry Construction, Demolition, Site Setup
No credit card · Instant access
Content at a glance
Preparatory construction activities required to support the installation of new roof trusses, internal upgrades, and associated structural, mechanical, and safety works within an operational school environment. The scope includes construction, demolition, temporary works, utility coordination, and safe access management.
- Tender type:
- Tender
- Contracting authority:
- CEIST (Catholic Education an Irish Schools Trust)
- Published:
- July 05, 2026
- Deadline:
- July 27, 2026
- Topic:
- Timber Construction
- Object:
- Schule
Object classification
- SchulePrimary
Tender description
Preparatory construction activities required to support the installation of new roof trusses, internal upgrades, and associated structural, mechanical, and safety works within an operational school environment. The scope includes construction, demolition, temporary works, utility coordination, and safe access management.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
4- St. Angela's Secondary School (Ballytruckle)waterfordDeadline: Jul 27
Works to Façade of St Joseph’s Building at St.Angela's Secondary School, Ursuline Convent, Waterford
The project comprises external refurbishment works to the existing school building, including the careful removal and disposal of existing defective render to the front and side elevations. The works include preparation of the underlying substrate and the application of a new breathable lime render system in accordance with the project specifications. The works further include the removal and replacement of existing rainwater goods, including gutters, downpipes, brackets, fixings and associated fittings, together with all necessary making good works. The project also includes the removal and replacement of defective window lintels, including all necessary temporary support works, localised opening-up works, reinstatement, repairs and making good to adjoining finishes. The Contractor shall carry out all works within a live school environment and shall allow for all necessary protection, access equipment, scaffolding, temporary works, dust suppression, safety measures, hoarding and phasing required to safely complete the works with minimal disruption to school activities. The works shall include all ancillary and associated works necessary for the proper completion of the project. - Transport Infrastructure Ireland (TII)DublinDeadline: Jul 24
MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for excavation and pile removal works near to Tara Street station (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information. - Transport Infrastructure Ireland (TII)DublinDeadline: Jul 13
MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will consist of call-off contracts for large elements of civils works, which may include station boxes, tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for the Glasnevin station retaining wall (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information. - Commissioners of Irish Lights_337DUN LAOGHAIRE
AIS Traffic Analysis and Monitoring system
This VEAT acknowledges that The Commissioners of Irish Lights proposes to place a contract with Gatehouse Maritime for the provision and support of an AIS Traffic Analysis and Monitoring solution for a period of 7 years (5+2). The scope of the current platform and solution provides an integrated Automatic Identification System (AIS) traffic analysis, monitoring and Aids to Navigation (AtoN) management capability supporting safe navigation, protection of critical national infrastructure and maritime domain awareness. It records and decodes AIS messages from base station networks and external AIS data feeds to provide a consolidated operational view of AtoN and vessel activity around Irish waters and key assets. The solution includes real time monitoring through a multi-layer graphical interface with nautical charts, operational layers, geospatial data and Application Programmable Interface (API) feeds from external data sources. It allows teams to view vessel movements, AtoN status, environmental and meteorological data, asset information and alarms in one environment. Approved data is shared with authorised third parties and other internal systems through controlled integrations, data feeds and data exports. The solution delivers AIS infrastructure assurance by monitoring AIS base station configurations, receivers, communications links and data quality. It provides visibility of coverage, uptime and data integrity, with alarms and alerting for degraded performance, signal issues, communications loss, downtime and other failures, keeping AIS and AtoN monitoring data reliable. The platform scales to manage increasing AIS message volumes as vessel traffic, data feeds and reporting requirements grow. For AtoN, the scope includes monitoring and management of physical, virtual and synthetic AtoN, including examples such as AIS equipped buoys, buoy position and movement, Remote Terminal Unit data, AtoN power supply, control cabinets, lights and optics, bearing turntables, Internet of Things devices and related infrastructure. These are not exhaustive, as the solution collects numerous other operational and status data points across connected assets. AtoN monitoring generates availability statistics, tracks service performance and provides evidence of operational reliability. It manages secure virtual and synthetic AIS targets during incidents, outages, works or temporary hazards. Custom graphical views centred on “light up” and “light down” times provide summary confirmation of light operations. Alarm creation and definitions are heavily customised to suit Irish Lights’ operational requirements and includes innovative logic, geofencing, threshold monitoring and group notifications for AtoN failures, “off position” drift, communications loss, abnormal readings and degraded service. Event histories, alarm trends, downtime configuration and graphing tools deliver fault investigation, data comparison and alarm rationalisation. Advanced AIS analytics use live and historical data to generate AtoN and vessel track histories, heat maps, traffic density analysis, incident review and historical AIS replay. These capabilities support AtoN planning, marine incident investigation, traffic analysis, post event reporting. The solution records and manages hazards and wrecks, including their associated geospatial extents, boundaries and caution areas, as part of navigational risk assessments and our statutory consenting process. The scope includes operational monitoring beyond AIS and AtoN. API connectivity and integrations bring in information from asset management systems, building management systems, server rooms, communication lines, chiller units and other infrastructure, allowing maritime, critical ICT infrastructure and facilities alarms or trends to be monitored alongside navigation critical information. Security, access control and “command and control” functions use secure data connections, user and group permissions, segregation of duties and role based access. As examples approved remote actions include power cycling, generator switching, controlled equipment resets and other authorised interventions, ensuring users can only access functions appropriate to their role. The current solution provides a single operational platform for maritime awareness, AIS assurance, AtoN monitoring and control, analytics, replay, reporting, alerting and integration with supporting infrastructure. Changing or replacing the solution at this stage would require re-engineering established interfaces, data feeds, integrations, operational processes and remote monitoring arrangements across the AIS and AtoN environment. It would also trigger procurement, implementation, migration, training, testing, validation and extended parallel running before equivalent capability could be assured. This would amount to a multi-year, high risk replacement programme with significant time required to configure, implement and reach full operational capability. The current solution is deeply embedded across the organisation, proven and reliable in a safety critical environment where uninterrupted service is essential. Its integrations, alarm logic, data views, “command and control” functions, reporting and workflows reflect years of configuration, bespoke development, refinement and organisational learning. Retaining it protects that investment while avoiding unnecessary upfront cost and operational risk. Retaining the existing solution is therefore the lowest risk and best value option for a highly integrated operational environment. It provides stability and a proven platform on which further functionality can be developed. Accordingly, continued use of the existing solution is the most efficient and proportionate means of maintaining compatibility, minimising disruption, protecting service continuity and safeguarding safe maritime operations while wider modernisation progresses.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 27. Juli 2026.
- Who is the contracting authority?
- The contracting authority is CEIST (Catholic Education an Irish Schools Trust).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.