Offaly County Council_448TullamoreTED
Enabling works contract to underground ESB Lines at Dargan Drive, Chancery Lane, Tullamore, Co Offaly
The Dargan Drive site is located to the South of Tullamore Town Centre. The site measures approximately 0.68Ha. The site is bounded to the North by a public road Chancery Lane; to the East by a vacant field; to the South by Irish Rail line and to the West by a dwelling. The main access to the site is located off Chancery Lane to the north...
Road Construction, Electrical Installation
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Offaly County Council_448
- Published:
- August 06, 2026
- Deadline:
- Not specified
- Topic:
- Road Construction
- Object:
- Stromnetz / Hochspannungsleitung
Object classification
- Stromnetz / HochspannungsleitungPrimary
Tender description
Show full descriptionCollapse description
The Dargan Drive site is located to the South of Tullamore Town Centre. The site measures approximately 0.68Ha. The site is bounded to the North by a public road Chancery Lane; to the East by a vacant field; to the South by Irish Rail line and to the West by a dwelling. The main access to the site is located off Chancery Lane to the north of the site. Offaly County Council proposes to develop a social housing scheme of 20 dwellings at vacant site on Chancery Lane, Tullamore. To facilitate the future development works it is required to divert and underground two overhead ESB power lines and also an existing Eir line. New footpath and front boundary wall works are to be included in this enabling works contract. It is to be noted that parts of the works occur in adjacent land access to same will be via agreement with the land owners. Full details of the extent of works are indicated on the drawings and other details which form part of the tender documents.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinDeadline: Aug 25This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
Iarnród Eireann-Irish RailDublinDeadline: Aug 04This is a call to competition by IE for the procurement of a Contractor for the Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. As part of the Glasnevin MetroLink Enabling Works Programme, a specialist Civils and Structures contractor is being procured to undertake both the detailed design and construction of key enabling works. The appointed contractor will play a key role in delivering the enabling works package, which will be undertaken in advance of, or in parallel with, the main MetroLink M100, M401 and M500 contracts and are critical to reducing programme risk, minimising disruption to existing rail services, and protecting the DART+ Programme.The provision of ESB Communication Tower Compound Maintenance Weed Control services
Electricity Supply Board ( ESB )DublinUp to three Applicants will be admitted to the Framework Agreement which will utilise the cascade method where the service is always offered first to the Framework Member who was ranked first at the framework agreement award stage and, if this Framework Member is not in a position to perform the Service, to the second ranked Framework Member and so on. ESBT owns and operates circa 330 tower sites countrywide. Each tower is to be maintained on a 12 month rotating schedule throughout the term of the contract. The sites will be categorised into the number of expected visits each year. Red – 3 Visits equally spread apart across 12 months Amber – 2 Visits equally spread across 12 months. Green – 1 visit in a 12 month period. Reactive site visits base on ad hoc safety alerts. There will be continuous evaluation of the status of these sites on a yearly basis. The number of site visits required may go up or down. It is proposed that the Contract will include: Complete de veg of site compound. Cut back any overhanging trees/vegetation on site perimeter. 1 meter width of vegetation to cleared around compound where possible to ensure no further growth through fence line. Ensure access track to site is clear and free of any vegetation. Access tracks to specific sites to be cut back to ensure safe access (list to be provided). Clear vegetation that blocks access to any RFE (ESB Mini Pillars). Spray site with appropriate weed killer to target specific weeds to prevent continued growth. Record and report any additional findings on site. Photograph and document Pre and Post works for ESBT records. Submit a hand over document in a PDF format, which shows the extent of the works carried out.Works Contract for Proposed Modular Expansions and Internal Refurbishment Works to Emergency Department at Beaumont Hospital
Beaumont Hospital_403DublinDeadline: Aug 24Beaumont Hospital intends to appoint a suitably-qualified and experienced works contractor to undertake modular expansion work and internal refurbishment works to the Emergency Department at Beaumont Hospital. Full further information regarding the project is contained in the Invitation to Tender documentation, available to download from www.etenders.gov.ie. As described by Volume C of the Invitation to Tender document, tenderers are required to provide costs for all phases of the envisaged works; for the avoidance of doubt, however, the Hospital reserves the right to award a contract for any combination of phases, depending upon final funding availability.Track upgrade Works at Youghal Greyhound stadium
Rásaíocht Con ÉireannLimerickDeadline: Jul 31The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.Framework agreement contracts - Welding and muffing district heating
LYSE NEO ASSTAVANGERDeadline: Aug 24The procurement is for a framework agreement for contract work in the form of welding and muffing of district heating pipes (fv-pipes). As a part of district heating development, the contracting authority has, in periods, a need for extra capacity. Typical work assignments that are included in this contract (not exhaustively, other assignments can occur): · Welding on county road pipes in the dimensions up to and including DN250 · Muffing on county road pipes in dimensions up to and including Ø 450 mm. The work place will be on the Contracting Authority's projects/sites in Nord-Jæren. Most of the contracting authority ́s district heating installations are located in Stavanger, Sandnes and Sola municipalities. The work will mainly take place outside in ditches in urban areas. Project work connected to district heating will mainly be carried out by the Contracting Authority's own installers/welders. The Contracting Authority can, however, use the Supplier for welding and movable work on district heating pipes at periods with many assignments and high activity. When working in ditches that can contain a lot of existing infrastructure, it can often be challenging to plan progress in a structured and rational way. The tenderer must expect to move between different projects, i.e. building and construction sites, within the working day/work period that each Call-off applies to. There may also be instances where the tenderer must move within a project during the work day. The tenderer's personnel will be managed/led by the Contracting Authority's project manager and the Contracting Authority presents the necessary material and work basis/drawings.IDA Ireland Demolition of Lissywollen House
IDA IrelandDublinThe proposed works that form part of this package are outlined briefly below; • Demolition of all existing structures on the site • Removal and safe disposal of all materials on the site including tyres. The site is to be left free from all materials. • Following demolition, the contractor is to undertake a topographical survey to tie into the previous survey undertaken on the site to fill in the gaps that would now exist due to the buildings being removed. • Please note that no trees are to be damaged during the works, please refer to Noel Lane Tree care services Arboricultural Safety Assessment Report along with accompanying Tree Protection Order MapContract 2421 Joinery work 1 - New Aker
Helse Sør-Øst RHFHAMARThe new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The Somatics building has a total area of approx. 130,000 m2 and it is divided into a base and high-rise building.2421 Joinery work 1 consists of the following main services. The list is not exhaustive. A complete overview of services is described in Annex C2 - Technical Description. Walls: Internal lining of outer walls, inner walls, skirting Solid gypsum ceilingsSmøremembran wall and uk covers Bushings and mouldings: For windows and doors, Sprinkler covers, disposable auxiliary work Assembly of doors and windowsLett covers/joists ceilingSventual adjoining works that the Builder needs for propulsion reasons. E.g. (but not limited to) floor treatment, binding dust to a lesser extent, auxiliary works for other technical disciplines, etc.Family Room Fit Out and Refurbishment Works for ICU North at Beaumont Hospital
Beaumont Hospital_403DublinDeadline: Jul 24The Contracting Authority intends to award a contract for fit-out and refurbishment works of an existing Family Room/Office Space in ICU North at Beaumont Hospital, Dublin 9. The facility, located on Level 3 next to the Intensive Care Unit, serves families of ICU patients and administrative staff. The current layout is sub-optimal due to a shared entrance. Further information is in the Invitation to Tender documentation available on www.etenders.gov.ie.R289 Kilcoon Road Realignment - Dromahair Co. Leitrim
Leitrim County Council_2136LeitrimDeadline: Jul 27The project aims to develop a comprehensive design for the delivery of excavating, realigning, and replacing the existing carriageway. It involves cutting in the existing upper embankment, strengthening the road embankment and pavement, and the installation of a VRS along the outside of the bend where the road section is situated on a steep slope and is showing structural cracks due to slope-side movement. The graded slope should be planted to improve the aesthetic appeal of the road section and to allow it to blend cohesively with the surrounding landscape. The construction of the realignment and remediation works of the slope are to be phased to minimise disruption to travel along the route. Construction will be carried out with the aim to keep one lane operational for the majority of the period of works. Stakeholder engagement, including workshops with key entities such as TII will be a critical component to ensure alignment with broader infrastructure goals. Ultimately, this initiative seeks to enhance road stability and safety, while also minimising disruption to traffic flow and impact on the environment. Works will include the following: • Fencing / Gates / Barriers • Site Clearance • Landscaping • Earthworks • Road Construction • Signage • Drainage • Vehicle Restraint System • Civils works to facilitate above
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Offaly County Council_448.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.