Dun Laoghaire-Rathdown County CouncilDún LaoghaireTED
DLR Co Co - Integrated Design Team for 25 Glenageary Road Upper
Bereitstellung eines integrierten Planungsteams (Integrated Design Team) für das Projekt 25 Glenageary Road Upper.
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Dun Laoghaire-Rathdown County Council
- Published:
- May 14, 2026
- Deadline:
- June 12, 2026
Tender description
Bereitstellung eines integrierten Planungsteams (Integrated Design Team) für das Projekt 25 Glenageary Road Upper.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
9Integrated Design Team for childcare building at Baile Ghib (Gibbstown), Co. na Mí
Atlantic Technological UniversityLetterkennyDeadline: Jul 13Naíonra Bhaile Ghib wish to appoint an Integrated Design Team service for the design, contractor procurement, construction management and supervision, and certification of a new naíonra (pre-school facility) for Naíonra Bhaile Ghib, Halla Bhaile Ghib, An Uaimh, Co, na Mí . Eircode: C15 VK499Engineer Led Integrated Design Team Consultancy Services for three (3) Aircraft Hangar Projects at Casement Aerodrome, Baldonnel, Co. Dublin
Department of Further and Higher Education Research Innovation and ScienceDublinEngineer Led Integrated Design Team Consultancy Services for three (3) Aircraft Hangar Projects at Casement Aerodrome, Baldonnel, Co. DublinTender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare
Clare County CouncilEnnisDeadline: Jun 02Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare.Procurement of an Architect-Led Integrated Design Team for the development of The Dingle Phoenix Redevelopment Project in Dingle, Co. Kerry from Stage 2c
Kerry County Council_1204TraleeDeadline: Jun 09Procurement of an Architect-Led Integrated Design Team for the development of The Dingle Phoenix Redevelopment Project in Dingle, Co. Kerry from Stage 2c.Architect Led Integrated Design Team Services for the Integrated Sports and Educational Campus, Kilmallock Road, Limerick
Limerick City and County Council_103432Limerick.Architektengeführte Planung für einen integrierten Sport- und Bildungscampus am LCETB-Standort, Kilmallock Road, Limerick. Der Leistungsumfang umfasst die Planung und Realisierung einer Vier-Feld-Sporthalle, externer Sportanlagen, die Aufwertung des öffentlichen Raums sowie alle zugehörigen Bauarbeiten.Appointment of an Integrated Design Team for UCC Outdoor Sports Facilities - Phase 1
University College CorkCorkThis competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrated team are • Civil and Structural Engineering Services (CSE) • Architectural Services (AS). • Mechanical and Electrical Engineering Services (MEP). • Project Supervisor Design Process (PSDP). The first phase to be delivered under the developed master plan is to include the following works. • Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. • Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. • The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)RFT 05/25DL – RFT for an Architect-led integrated Design Team for the design, construction and fit out of a Veterinary Facility at Atlantic Technological University (ATU), Letterkenny, Co. Donegal
Atlantic Technological UniversityLetterkennyAtlantic Technological University (ATU) sucht ein architektgeführtes integriertes Planungsteam für Planung, Bau und Ausstattung einer tiermedizinischen Einrichtung in Letterkenny, Co. Donegal. Das Team erbringt Bau- und Tragwerksplanung, technische Gebäudeausrüstung, Brandschutz, PSDP und Energieeffizienzberatung. Zusammenarbeit mit separat beauftragtem Projektmanager und Vermessungsberater.Procurement of Integrated Design Team Services for the Development of Donegal Green Lab
Donegal County Council_1193LiffordDeadline: Jun 02Donegal County Council on behalf of Donegal Green Lab is seeking an Integrated Design Team for a new three-storey 19,800 sq ft facility providing enterprise, incubation, training, laboratory, collaboration space, parking, and associated site works.Architect led Integrated Design Team Consultancy Services for the Mixed-Use Redevelopment at the Athea Community Council Building, Co. Limerick
Athea Community Council Company CLGAtheaDeadline: Jun 05Procurement of an Architect led Integrated Design Team for Stage (ii)b to Stage (v) services under the Capital Works Management Framework. The team will redevelop the Athea Community Council Building on Con Colbert Street, Athea, Co. Limerick into a mixed-use development with a ground floor unit and residential accommodation on first and second floors.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 12. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Dun Laoghaire-Rathdown County Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.