Electricity Supply BoardDublinTED
D20/CON/1056
CON 1056 - 110KV Power Transformers Kennung des Verfahrens: 01c615b4-ac76-42b6-857d-f832c8b9b862 Verfahrensart: Verhandlungsverfahren mit vorheriger Veröffentlichung eines Aufrufs zum Wettbewerb/Verhandlungsverfahren
Generators
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Electricity Supply Board
- Published:
- July 08, 2026
- Deadline:
- Not specified
- Topic:
- Generators
Tender description
CON 1056 - 110KV Power Transformers Kennung des Verfahrens: 01c615b4-ac76-42b6-857d-f832c8b9b862 Verfahrensart: Verhandlungsverfahren mit vorheriger Veröffentlichung eines Aufrufs zum Wettbewerb/Verhandlungsverfahren
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock16 details capturedBidders and contractors · Address
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
8D20/CON/114B
Electricity Supply BoardDublinCON 114B - MV and 38KV Steel Cable DrumsD20/CON/1106 - STANDBY GENERATORS FOR ESB PREMISES
Electricity Supply BoardDublinStandby‑Dreiphasen‑Generatoren für ESB‑StandorteD20/CON/429 — Plastic Cable Ties
ESB NetworksDublinPlastic cable ties, used mainly for tying MV single core XLPE cables in TRFORMATION in trenches and for fixing overhead LV bundled conductor to brackets. Smart metering cable ties for install.PROCEDIMIENTO ABIERTO CON PLURALIDAD DE CRITERIOS
FUNDACION IMDEA NANOCIENCIAMADRIDDeadline: Sep 14Liefervertrag für ein Tiefenkraftmikroskop (STM/nc‑AFM) mit Tieftemperatur‑ und Ultrahochvakuum‑Umgebung, integriertem Magnetfeld und Lichtsammlung für die IMDEA Nanowissenschafts‑Stiftung.Lieferung eines Cone Calorimeters inkl. des FTIR-Spektrometer
Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR) - OberpfaffenhofenWeßlingDeadline: Jul 22Das Institut für Fahrzeugkonzepte beschafft ein Cone Calorimeter inkl. FTIR-Spektrometer für das „Materials Lab for Zero Emission Mobility“. Ziel ist die normgerechte Untersuchung der Brennbarkeit und Toxizität nachhaltiger Naturwerkstoffe (z.B. Holzwerkstoffe) für den Struktureinsatz in Straßen- und Schienenfahrzeugen. Weitere Details in der Leistungsbeschreibung vom 19.06.2026.Con 1094 - Live Working Insulted Tools & Accessories
ESBDublin 2Bereitstellung von Entwurf, Fertigung, Prüfung, Lieferung und Installation von 10 kV/20 kV Live‑Work‑Isolierwerkzeugen (Hot Sticks) und zugehörigem Zubehör.CON 1162 Smart Electricity Meters, Smart AMI HES
Electricity Supply BoardDublinDeadline: Jul 08The Contracting Entity intends to procure a multi-vendor framework agreement for the provision of Lot 1: Smart Electricity Meters and Lot 2: Smart Advanced Metering Infrastructure (AMI) Head-End System (HES). ESB anticipates procuring: • Manufacture, supply, and delivery of up to 1,500,000 Single-Phase and Three-Phase Whole current Smart Electricity Meters, to be called off incrementally over the life of the framework as required. • Development (inclusive of Security Architecture), development, implementation, and integration of the required IT systems, including but not limited to the following: • A Head End System (HES) capable of integrating with multiple SEM meter vendor’s products concurrently, delivering high levels of interoperability across multiple devices, communications and system vendors within a complex AMI environment. • A Head-End System (HES) capable of meeting ESB Networks’ functional, security, and performance requirement for 1.5 million SEMs initially and the capacity to scale up to potentially 3 million SEMs during the contract term. • The integration and development of an adaptor between the HES and the Siemens Energy IP Meter Data Management System (MDMS). • All associated integrations with existing ESB Networks systems and operational platforms. • Integration with Mobile Network Operator systems • Implementation of the AC Electricity Smart Meter Generic Companion Profile (ACE SM GCP) and local customisations to support the reliable and secure communication between the HES and SEMs across Wide Area Network (WAN) technologies. • System implementation services, including configuration, testing, migration, and commissioning of the proposed IT systems. • Ongoing support, maintenance, and management services to ensure continuity of operations, system performance, and long-term lifecycle management. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attacAbbrucharbeiten und Schadstoffsanierung, Einlagerung nach DIN 18 459, 18 300 - 2 Lose - Vergabe-Nr.: 1056/2026
Bundesamt für Bauwesen und Raumordnung, Straße des 17. Juni 112, 10623 Berlin - Mail: [email protected]Deadline: Jul 31Die vorstehende Veröffentlichung dient a usschließlich der für den Auftraggeber vorgeschriebenen Information nach §20 Abs. 4 VOB/A. Sie beinhaltet keine Aufforderung zur Interessenbekundung. Es handelt sich um eine beabsichtigte Beschränkte Ausschreibungnach VOB. Bundespräsidialamt, Spreeweg 1, 10557 Berlin Abbrucharbeiten und Schadstoffsanierung, Einlagerung nach DIN 18 459, 18 300 - 2 Lose Die Vorabmaßnahme beinhaltet das Freiräumen und Herrichten von Baufeldern einer Liegenschaft: Abbruch von Pflaster- und Fahrbahnflächen: ca. 2.100 m2 Rückbau von Ein- und Aufbauten im Gelände: ca. 170 m3 Entfernen von Sträuchern sowie Baumfällarbeiten: 60 m Sträucher, 36 St. Bäume Abtrag von Oberboden und Restmaterialien: ca. 2.700 m2 Teilabbruch von 2 Gebäuden: ca. 2.800 m3 fachgerechte Abfuhr und Entsorgung der Abbruchmaterialien: ca. 5.600 t Ausführungsbeginn: 15.10.2026 und Ausführunsende: 28.02.2027 Abbrucharbeiten und Schadstoffsanierung, Einlagerung nach DIN 18 459, 18 300
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Electricity Supply Board.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.