Vantaan Energia OyVantaaTED
CTES: Low Voltage Switchgears and UPS
Vantaan Energia is planning to purchase as follows: Preliminary scope of supply consists of 2 pcs of 690 VAC switchgears, 12 pcs 400 VAC switchgears 9 pcs of LV bus ducts 2 pcs of UPS 2 pcs of Battery back-up system defined in Appendix 1. The final scope and options will be announced later in the final inquiry material.
Energy Storage, Grid Infrastructure
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Vantaan Energia Oy
- Published:
- June 28, 2026
- Deadline:
- August 14, 2026
- Topic:
- Energy Storage
Tender description
Vantaan Energia is planning to purchase as follows: Preliminary scope of supply consists of 2 pcs of 690 VAC switchgears, 12 pcs 400 VAC switchgears 9 pcs of LV bus ducts 2 pcs of UPS 2 pcs of Battery back-up system defined in Appendix 1. The final scope and options will be announced later in the final inquiry material.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
9CTES: RU02 Diffuser Pipes and its bulkhead structures
Vantaan Energia OyVantaaDeadline: Aug 05Scope of supply consists of the complete RU02 RU02 Diffuser Pipes and its bulkhead structures defined in Appendix 1 The final scope and options will be announced later in the final inquiry material.Concept, design and alteration of the High Voltage Generator (HOG)
Bane NOR SFHAMARBane NOR and Trafikverket have procured a number of rotating 10 VAT converters from DB. These machines are originally designed with an output voltage on the generator side of 5100V. To achieve the desired voltage of 16.5 kV in the rail network, the voltage from the original converter machines must be transformed up via a 1-phase transformer. The purpose of this project is to rebuild the stator of the converter, so that 16.5 kV can be achieved directly without the additional 1-phase transformer.N86 Ballynasare Lower to Ballinclare and Doonore North to Ballygarret Road Improvement Scheme
Kerry County Council_1204TraleeDeadline: Jun 29The N86 National Secondary Road commences in Tralee, and travels west through Blennerville, Camp, Annascaul, Lispole and terminates in Dingle. The N86 Ballynasare Lower to Ballinclare and Doonore North to Ballygarret Road Improvement Scheme comprises two discrete sections which are selected to maximise re-use of acceptable material on the subject scheme and on the overall scheme. Ballynasare Lower to Ballinclare. This section of the scheme is approximately 3.8km in length and extends from the townland of Ballynasare Lower in the west to the townland of Ballinclare at the western end of Annascaul village. Doonore North to Ballygarret. This section of the scheme is approximately 2.25km in length and extends from the townland of Doonore North in the west to the townland of Ballygarret in the east.HHF Test Services for In-Vessel and JT 60 Mock-ups
The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')BarcelonaThe preparation and the High Heat Flux testing of ITER Normal Heat Flux Tungsten Mock-ups such as First Wall tungsten Small Scale Mock-Ups, JT60-SA tungsten monoblock mock-ups and technology development tungsten mock-upsRequest for Information - Mechanical Couplings and Gas Shut-Off Valves for Low-Pressure Gas Networks (≤63 mm)
Stedin Netbeheer B.V.RotterdamDeadline: Jul 29The participating Dutch Distribution System Operators (DSOs) Stedin, Alliander and Enexis intend to conduct a joint procurement procedure for the supply of mechanical fittings and shut-off valves for gas distribution networks. The scope includes the supply of mechanical couplings, transition fittings, ancillary components (including support inserts where applicable) and mechanically connected shut-off valves suitable for polyethylene (PE) gas pipelines with nominal diameters up to and including 63 mm. The products are intended for use in low- and medium-pressure gas distribution networks and must comply with applicable technical standards, certification requirements and quality requirements for gas infrastructure applications. Through this market consultation, the contracting entities aim to obtain information regarding available products, market developments, sustainability opportunities, innovation potential, security of supply, technical developments (including suitability for future energy carriers where applicable) and possible procurement strategies. No contract will be awarded as a result of this market consultation. Information obtained may be used in preparation of a future procurement procedure.Tender for the Supply, Delivery, Installation, Testing, Commissioning of Low Light Pollution Decorative Luminaires and Provision and Installation of Protection Fence in Ġnien il-Barnuża l-Ħamra, Il-Baħrija, Ir-Rabat, Malta
Rabat Local Council (Malta)RABATDeadline: Jul 20The subject of this call for tenders is the supply, delivery, installation, testing, commissioning of low light pollution decorative luminaires and provision and installation of protection fence in Ġnien il-Barnuża l-Ħamra, il-Baħrija, ir-Rabat, Malta. The place of acceptance of the works shall be at Baħrija, limits of Ir-Rabat, Malta and the time-limits for the execution of the contract (supply, delivery, installation, testing, commissioning of low light pollution decorative luminaires and provision and installation of protection fence) shall be eight (8) weeks with a Maintenance Period of four (4) years from the formal notice of commencement.Purchase of a high-voltage shore connection (HVSC) including an onshore power system (OPS) and a cable management system (CMS) for the supply of electrical power to cruise ships in Port of Skagen.
Skagen HavnSkagenOn shore power for cruise ships shall be established at the cruise quay Krydstogtkajen in Port of Skagen, 9990 Skagen, Denmark. For this purpose, the Contractor shall deliver a high-voltage shore connection (HVSC) including an onshore power system (OPS) and a cable management system (CMS). The HVSC shall be able to deliver up till 16 MVA of high-voltage onshore power to at least one cruise ship at a time. The Deliverables include a complete converter station and a complete cable management solution from the OPS on to the quay front. The converter station shall be a container-based solution, where all components are to be placed inside containers, except coolers that shall be placed on the ground outside the building, which the Purchaser will build around the containers. The Contractor shall be responsible for groundwork for the CMS. The Contractor shall deliver all necessary documentation and perform training of the personnel who shall operate the HVSC upon Delivery. The HVSC shall be operational by 1st of November 2027. Definitions: High-voltage Shore Connection (HVSC): includes the Onshore Power System (OPS), the Cable Management System (CMS) and the high voltage cable distribution system from the OPS to the quay front. Onshore Power System (OPS): includes all the components necessary to transform, convert and monitor the power on shore, including, but not limited to, transformers, converters, switch gear, breakers and control, monitoring, interlocking and power management systems. Cable Management System (CMS): includes all work, cables and equipment needed from the OPS to the quay front for delivering power to the ships. This includes HV shore distribution systems (from the OPS), shore-to-ship connection and interface equipment and other items necessary for delivering power to the cruise ships. Maintenance: All maintenance necessary for the proper functioning of the HVSC shall be performed by the Contractor during the warranty period. The length of the warrantyCT2170/2026 - Tender for the supply, delivery and commissioning of four (4) brand new low emission 17 – 19 Tonne Water Bowsers to the Cleansing and Maintenance Division (CMD) within the Ministry for the Local Government and Public Works (MLGP)
Department of ContractsFlorianaDeadline: Aug 05Tender for the supply, delivery and commissioning of four (4) brand new low emission 17 – 19 Tonne Water Bowsers to the Cleansing and Maintenance Division (CMD) within the Ministry for the Local Government and Public Works (MLGP)CTES: 20kV Switchgears and transformers
Vantaan Energia OyVantaaDeadline: Jun 22Vorläufiger Lieferumfang: 2 Stück 20kV-Schaltanlagen, 4 Stück Verteilungstransformatoren und 1 Stück 20kV-Sammelschienenkanal (definiert in Anhang 1). Endgültiger Umfang und Optionen werden später im endgültigen Ausschreibungsmaterial bekannt gegeben.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 14. August 2026.
- Who is the contracting authority?
- The contracting authority is Vantaan Energia Oy.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.