Department of ContractsFlorianaTED
CT2142/2026 - FRAMEWORK AGREEMENT (WITH JOB ORDERS) COVERING VARIOUS ENVIRONMENTALLY SUSTAINABLE CIVIL AND INFRASTRUCTURAL WORKS FOR THE COMMUNITY PROJECTS DIVISION WITHIN THE PUBLIC WORKS DEPARTMENT LOT 1 (SMALL WORKS) AND LOT 2 (LARGE WORKS)
Rahmenvereinbarung für umweltverträgliche Tiefbau- und Infrastrukturarbeiten für die Abteilung Community Projects des Public Works Department. Die Vergabe erfolgt in zwei Losen: Los 1 umfasst kleinere Bauarbeiten, Los 2 umfasst größere Bauarbeiten. Die Beauftragung erfolgt über Einzelabrufe.
Road Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Department of Contracts
- Published:
- April 27, 2026
- Deadline:
- June 01, 2026
- Topic:
- Road Construction
Tender description
Rahmenvereinbarung für umweltverträgliche Tiefbau- und Infrastrukturarbeiten für die Abteilung Community Projects des Public Works Department. Die Vergabe erfolgt in zwei Losen: Los 1 umfasst kleinere Bauarbeiten, Los 2 umfasst größere Bauarbeiten. Die Beauftragung erfolgt über Einzelabrufe.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock2 details capturedLots LOT-0001 · Lots LOT-0002
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
9CT2177/2026 - FRAMEWORK AGREEMENT (WITH JOB ORDERS) COVERING VARIOUS ENVIRONMENTALLY SUSTAINABLE CIVIL AND INFRASTRUCTURAL WORKS FOR THE COMMUNITY PROJECTS DIVISION WITHIN THE PUBLIC WORKS DEPARTMENT LOT 1 (SMALL WORKS) AND LOT 2 (LARGE WORKS)
Department of ContractsFlorianaDeadline: Jul 01FRAMEWORK AGREEMENT (WITH JOB ORDERS) COVERING VARIOUS ENVIRONMENTALLY SUSTAINABLE CIVIL AND INFRASTRUCTURAL WORKS FOR THE COMMUNITY PROJECTS DIVISION WITHIN THE PUBLIC WORKS DEPARTMENT LOT 1 (SMALL WORKS) AND LOT 2 (LARGE WORKS)CT2140/2025 - FRAMEWORK AGREEMENT (WITH JOB ORDERS) FOR THE PROVISION OF ARCHITECTURAL, CIVIL ENGINEERING AND PROJECT MANAGEMENT SERVICES TO THE LOGISTIC UNIT WITHIN THE MINISTRY FOR MEYR
Department of ContractsFlorianaRahmenvereinbarung für Architektur-, Bau-, Elektro-, Maschinenbau- und IT-Ingenieurleistungen sowie Projektmanagement. Der Auftrag umfasst die Steuerung von Arbeiten, insbesondere: i. Geländeräumung, Abbruch, Erdarbeiten und Tiefbau, ii. Innen- und Außenputz- sowie Ausbauarbeiten, iii. Elektro- und mechanische Installationen, iv. IT-Infrastrukturarbeiten, v. Entfernung, Entsorgung und Export gefährlicher Materialien.CT2026/2026 - Framework Contract for the Supply and Planting of Mature Trees including Ancillary Works, using Environmentally Methods and Materials for Project Green
Department of ContractsFlorianaDeadline: Jun 12Der Auftrag umfasst die Lieferung und Pflanzung von ausgewachsenen Bäumen einschließlich Nebenarbeiten unter Verwendung umweltfreundlicher Methoden und Materialien für das Projekt Green. Es handelt sich um einen Rahmenvertrag.SPD8/2026/039 TENDER FOR FINISHING WORKS FOR THE MINISTRY AND PS OFFICES AT THE OLD FARMHOUSE WITHIN THE AGRICULTURE RESEARCH AND INNOVATION HUB, IN LINE WITH SUSTAINABLE ENVIRONMENTAL PERFORMANCE STANDARDS
Sectoral Procurement DirectorateFlorianaDeadline: May 25The subject of this tender is for the finishes works for the Ministry and PS Offices at the Old Farmhouse within the Agriculture Research and Innovation Hub in line with sustainable environmental performance standards.Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County CouncilCorkDeadline: Jun 26Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement.DLR Co Co - Multi-Party Framework Agreement for the Construction of Public Parks and Related Works for Dún Laoghaire Rathdown County Council (2026 to 2030) Initial Project: The Metals Green
Dun Laoghaire-Rathdown County CouncilDún LaoghaireDeadline: Jun 10The Metals Green, Dún Laoghaire: construction of a new 3,500m² public park on a green field site. Works include earthworks, paving, in-situ concrete wall, railing, pavement works, drainage, SuDs, public lighting, granite edging/wall/seating features, soft landscaping.SPD6/2026/017 - SUPPLIES - TENDER FOR THE SUPPLY AND DELIVERY OF BRAND-NEW ECO-FRIENDLY 12-TONNE NON-TIPPING TRUCK WITH LOADING CRANE TO PUBLIC WORKS DEPARTMENT
Sectoral Procurement DirectorateFlorianaDeadline: Jun 16Supply and delivery of a brand-new eco-friendly 12-tonne non-tipping truck with loading crane to the Public Works Department.Baumeisterarbeiten Ergänzung Strassenentwässerung Lanzenhäusern
Tiefbauamt des Kantons BernBernDeadline: May 17Baumeisterarbeiten zur Strassenentwässerung in Lanzenhäusern. Bernstrasse 97-107 (150 m): Randabschlüsse, Ersatzneubau Sammelleitung, Speicherkanal, drei Kontrollschächte, vier Strassenabläufe, Belagsersatz (halbe Breite). Bernstrasse 115-155 (560 m): Randabschlüsse, Anpassung Sammelleitung, Kontrollschacht DN 1000, Speicherkanal DN 630 (160 m), drei Kontrollschächte DN 1500, neue Strassenabläufe, Belagsersatz (ganze Breite). Inkl. Baustelleneinrichtung und Verkehrsführung.VE 3100 Verkehrsanlagen - Lückenschluss Linie 6 - Baubereich West
Stadtwerke Augsburg Holding GmbH, Bau-EinkaufDie Maßnahme umfasst Gleisbau-, Straßen- und Tiefbauarbeiten sowie die Errichtung von Lichtsignalanlagen für den Lückenschluss der Linie 6 (Baubereich West). Die Vergabe erfolgt in einem Paket für verschiedene Auftraggeber (swa Verkehrs GmbH, swa Netze GmbH, LEW TelNet GmbH, MTBA), die ihre Anteile separat beauftragen. Die Ausführung ist für den Zeitraum von KW 19/2026 bis Dezember 2027 geplant.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 01. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Department of Contracts.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.