Metroselskabet I/SKøbenhavn STED
Copenhagen - New Metroline, M5 Transportation System
This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance...
Vehicles, Buses & Rail Vehicles, Vehicle Maintenance
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Metroselskabet I/S
- Published:
- July 23, 2026
- Deadline:
- September 08, 2026
- Topic:
- Vehicles
- Object:
- Bahngleis / Schienenstrecke
Object classification
- Bahngleis / SchienenstreckePrimary
Tender description
Show full descriptionCollapse description
This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but is also planned to extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. The current tender, Phase 1, encompasses the southern section of the line, from København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes the northern section with an anticipated operatonal commencement of the last part of the northern section in 2045 (included in the transportation system contract (TSS-contract) as options) and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. The procurement comprises the following, together constituting a mixed procurement within the meaning of Article 5 (2) of the Utilities Directive: 1) A TRANSPORTATION SYSTEM for M5 south encompassing the subsystems rolling stock (passenger vehicles, service vehicles and rescue trolleys), railway infrastructure (signaling system and other subsystems, excluding permanent way and power supply "on the line"), and a CMC (control and maintenance center). Furthermore, O&M supplies (supplies related to the O&M providers operation and maintenance activities such as maintenance plans and training). “On the line” refers to deliveries outside the CMC (as the Transportation System Contractor (TSC) is itself responsible for power supply and permanent way within the CMC). The integration of the mentioned TS-subs
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
5Copenhagen - New Metroline, M5 Civil Works South
Metroselskabet I/SKøbenhavn SDeadline: Aug 25This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored tunnels, 5 underground stations(incl. 3 transfer stations),2 underground crossovers,5 cross passages,1 ramp, approx 2.0 km viaduct,1 elevated station, 1 viaduct cross-over,1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in parallel with M5 Civil Works South) • Operation and Maintenance South contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (wiMarket dialogue - Copenhagen - New Metroline M5 Civil Works
Metroselskabet I/SKøbenhavn SDeadline: Sep 13Metroselskabet choose to cancel the procurement procedure for Copenhagen New Metroline M5 Civil works (CWS contract), ref. is made to contract notice 466390-2026 with subsequent change notice 562117-2026. Metroselskabet intends to re-tender the CWS contract in September 2026 following a brief market dialogue. The market dialogue will run from the publication of this notice to the end of August. Metroselskabet expects to use the following Byggeprojekt platform to share information to be used in the market dialogue: https://app.byggeprojekt.dk/webapp/public/2151-M5_CWS_South_New_Metroline_Copenhagen_Market_dialogue Potential interested tenderers are encouraged to register to the market dialogue.Cityringen Extension Extension of existing transportation system
Metroselskabet I/SKøbenhavn SThe contract comprises the Transportation System ("TS") for the extension of Cityringen to Nordhavn. Metroselskabet ("MS") is constructing Cityringen in Copenhagen. Cityringen comprises 16 km tunnels, 17 underground stations and 4 shafts. MS is going to construct an extension to Nordhavnen (CRNHE). CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line in Nordhavn is an attractive and function part of the network, but the CRNHE project aims to improve in terms of sustainability, passenger experience and operation. The transportation system contract for the Nordhavn Extension comprises all transportation systems and subsystems related to the extension, including Automatic Train Control (ATC), Passenger Security and Information System, Supervisory Control and Data (SCADA), Control Centre, Transmission Systems, and related fully integrated subsystems.Provision of a new Finance Management System (FMS
Educational Research Centre_1014DublinThe Educational Research Centre are inviting tenders for the implementation of a cloud-based Financial Management System. The services to be provided under this contract are as follows: • A cloud-based Financial Management System that meets the requirements described in Appendix 1 of the ITT document. • Complete system delivery including system implementation, system testing, project management, and data migration. • A training programme as well as training materials and documentation. • On-going support and maintenance service.Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Donegal County Council_1193LiffordDeadline: Aug 17Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 08. September 2026.
- Who is the contracting authority?
- The contracting authority is Metroselskabet I/S.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.