Helse Sør-Øst RHFHAMARTED
Contract 2461 Painting work 1 - New Aker
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. Contract 2461 consists of the following main services. The list is not exhaustive. A complete overview of services is described in Annex C2 - 3420 description. Sparkling Painting treatment in aesthetic classificati...
Concrete Works, Dry Construction, Painting
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Helse Sør-Øst RHF
- Published:
- June 21, 2026
- Deadline:
- August 11, 2026
- Topic:
- Concrete Works
- Object:
- Krankenhaus / Klinik
Object classification
- Krankenhaus / KlinikPrimary
Tender description
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. Contract 2461 consists of the following main services. The list is not exhaustive. A complete overview of services is described in Annex C2 - 3420 description. Sparkling Painting treatment in aesthetic classification 1, 2 and 3Spesial painting hygieneSpesial painting cleanroomsVåtroms treatment, binding of concrete clearing/treatment of concrete walls before paintingContrast painting concrete around lift fronts Spray paint in auditoriums over raster ceilings
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Related tenders
10Contract 2421 Joinery work 1 - New Aker
Helse Sør-Øst RHFHAMARThe new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The Somatics building has a total area of approx. 130,000 m2 and it is divided into a base and high-rise building.2421 Joinery work 1 consists of the following main services. The list is not exhaustive. A complete overview of services is described in Annex C2 - Technical Description. Walls: Internal lining of outer walls, inner walls, skirting Solid gypsum ceilingsSmøremembran wall and uk covers Bushings and mouldings: For windows and doors, Sprinkler covers, disposable auxiliary work Assembly of doors and windowsLett covers/joists ceilingSventual adjoining works that the Builder needs for propulsion reasons. E.g. (but not limited to) floor treatment, binding dust to a lesser extent, auxiliary works for other technical disciplines, etc.Prequalification Contract 2442 Laminate and steel plate doors - New Aker
Helse Sør-Øst RHFHAMARDeadline: Aug 17The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-risers.2442 Laminate and steel plate doors consist of the following main services: Laminate doorsLaminat doors with beam door with glass panes/sealed beams above/next to the door Doors are with and without windows.Prequalification Contract 2441 Steel profile doors and walls - New Aker
Helse Sør-Øst RHFHAMARDeadline: Aug 21The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-rise buildings.2441 Steel profile doors and walls consist of the following main services: Profile doors, where the majority of the doors are steel profile doors, whilst the doors at the wind trap are aluminium profile doors, steel profile doors with glass/fixed field on the side and overAluminium ́s profile doors with glass/fixed field on the side and overSkyved doors in steel profile with glass/fixed field on the side and overglass/fixed field without door. Steel and AluminiumNew Rjukan treatment facility, collaboration contract
Tinn kommuneRjukanDeadline: Aug 11Tinn municipality is in a process to upgrade the sewage treatment facilities in the municipality. Sewage from the urban areas Mårvik, Attrå and Austbygde have gathered for a new treatment facility established in Mårvik. Rjukan treatment facility shall be cleared and a new treatment facility shall be constructed next to the existing (day facility). Tinn municipality now has a total of three treatment facilities. The treatment facility for Rjukan is the largest and receives sewage water from Rjukan village, as well as holiday homes in the Gaustablikk area. The purified sewage water is emitted to the Hydro tunnel, which is brought down to Tinnsjøen. Rjukan RA is a mechanical/chemical treatment facility based on post-deedimentation. This is a rock plant where the treatment process takes place in rock halls. The external building is a building that houses personnel rooms as well as sludge dewatering and unloading to containers. The average purification effect for total phosphor in 2024 was 83.3%. Only 7 out of 12 samples have been assessed to be within the purification requirement of 90%. We see from the Annual Report for Rjukan RA that the plant is unable to fulfil the cleaning result requirement for phosphors in the event of heavy precipitation and snow melting. The purification result for chemical oxygen consumption (KOF) has been complied with. The existing installations have a capacity of 7700pe. With future tourist development and population growth, new treatment facilities must have a capacity of 17,200pe. This as a backdrop also requires that a new treatment facility must have secondary purification. In addition Statsforvalter has issued an order for 70% nitrogen removal with deadline 01.03.2029 and 80% nitrogen removal by deadline 31.12.2030. The installation will be established at Bruflot, east of the centre of Rjukan. The procurement ́s value is estimated to NOK 320,000,000 excluding VAT. The value is an estimate and is not binding for the contracting authoritPrior information notice – Information about the coming procurement – Contract 2215 Helicopter platform, The New Rikshospitalet [Nye Rikshospitalet]
Helse Sør-Øst RHFHAMARDeadline: Jul 11Contract 2015 is a turnkey contract for the engineering design services for and the construction of two helicopter platforms with the accompanying technical installations and walkways up to the lift/stairway. The platforms shall be located on the roof of the new treatment building J (floor 13) and will be used by the air ambulance and rescue service for emergency transport to the newRikshospitalet. See the attached document for further information.Contract Contract 7037 Gaustadalleen - New Rikshospitalet
Helse Sør-Øst RHFHAMARThe contract consists of upgrading Gaustadalléen, as a part of the development of the New Rikshospitalet. The establishment of the initiative will be permanent.Invitation to market dialogue Contract 2424 Carpentry work - New Aker
Helse Sør-Øst RHFHAMARDeadline: Jul 26Helse Sør-Øst RHF ́s project organisation for the hospital projects in Oslo invites tenderers to a market dialogue on Contract 2424 Carpentry work for the Somatikkbygg on the site where the New Aker Hospital shall be constructed. Contract 2424 mainly includes fixed benches, furniture, room dividers, receptions/receptions, lining walls, cubic floors as well as changing cupboards and cupboards in the somatic building's (Building D) base and high-rises.CT3039/2026 - Tender for the Restoration of External Facades and Roof Consolidation of the Vajrinġa Buildings in Victoria, Gozo, Including Environmentally Friendly Painting Works
Department of ContractsFlorianaDeadline: Aug 21CT3039/2026 - Tender for the Restoration of External Facades and Roof Consolidation of the Vajrinġa Buildings in Victoria, Gozo, Including Environmentally Friendly Painting WorksContract Contract 3301 Fire Extinguishing - New Rikshospitalet
Helse Sør-Øst RHFHAMARThe aim of the procurement is to engage a tenderer who will be responsible for the services that shall be delivered in contract 3301 Fire extinguishing at the New Rikshospitalet.Contract procurement - UDK55 - Flood road Sundland east ground work
Bane NOR SFHAMARDeadline: Jun 24UDK55 is an execution contract for the establishment of a flood road both as an open stream and in pipe ditch with braced and unscuitable ditch. The pipe route shall be established with a large number of concrete manholes in cast-on-site and prefabricated execution. The flood road shall be completed with an emission structure in waterways. Green areas with varying planting shall be established along the open stream system. Approx. over pipe trenches shall be constructed. 200 m road for future Sundlansveien (east) phase 1. The delivery also includes redevelopment of one residential property, as well as one major storage/workshop building. See the contract ́s chapter A3 "Information on the project" and the documents in the contract chapter D for further details. The implementation of the project depends on political decisions from Drammen municipality autumn 2026.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 11. August 2026.
- Who is the contracting authority?
- The contracting authority is Helse Sør-Øst RHF.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.