Ardrahan NS Board of ManagementArdrahanTED
Construction of two new classrooms and office at Ardrahan NS. Extend playground hard surface area and upgrade the existing wastewater treatment system
To construct an extension to the existing National School. 2. Demolish existing storage sheds and extend playground hard surface area and 3. upgrade the existing wastewater treatment system
Paving, Non-Residential Building
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Ardrahan NS Board of Management
- Published:
- August 05, 2026
- Deadline:
- August 24, 2026
- Topic:
- Paving
Tender description
To construct an extension to the existing National School. 2. Demolish existing storage sheds and extend playground hard surface area and 3. upgrade the existing wastewater treatment system
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
4Construction of two new classrooms and office at Ardrahan NS. Demolition of two existing storage sheds and extend playground hard surface area and upgrade the existing wastewater treatment system
Ardrahan NS Board of ManagementArdrahanDeadline: Aug 24To construct an extension to the existing National School. 2. Demolish existing storage sheds and extend playground hard surface area and 3. upgrade the existing wastewater treatment systemInstallation of New Floodlighting System (pitch 2) and Upgrade of Existing Floodlighting System (pitch 1)
Raheens GAANaasDeadline: Jul 09The Works comprise: A. The complete upgrade of the existing floodlighting installation serving Pitch No. 1 through removal of existing equipment and replacement with modern LED floodlighting system. B. The complete design, supply, installation, commissioning, testing and certification of a new floodlighting installation to Pitch No. 2. The successful Contractor shall provide complete turnkey operational floodlighting systems including all associated electrical works, control systems, civil works, trenching, ducting, cabling, equipment pillars, switchgear, testing, certification and commissioning.HCS 0319 - Construction of 30no. social housing units and all associated site development works at Cois Abhainn (Phase 3), St. Johnston, Co. Donegal
Donegal County Council_1193LiffordThe works comprise of the construction of 30no. two storey social housing units consisting of 4no. 1 bedroom apartments, 4no. 2 bedroom apartments, 8no. 2 bedroom houses, 12no. 3 bedroom houses, 2no. 4 bedroom houses. The associated site works and services consist of the following non exhaustive list: site clearance and excavation works, ESB diversions, new access roads, resurfacing of existing roads, retaining walls, footpaths, on site surface water attenuation, underground static water storage tanks, carparking, construction of new foul and surface water connections to include upgrade of existing foul wastewater pumping station with a new rising main and installation of watermain booster pump.Tender for Project Shine for the Design, Supply and Install of Fire Suppression and Fire Abatement system at MEDITE Europe DAC ‘26
Medite Europe DACClonmelDeadline: Jul 09MEDITE Europe DAC is investing in new plant and equipment under the title Project Shine. Project Shine involves the installation of the following: • Wet fuel handling systems. • Dry Fuel handling systems. • 56MW Biomass Energy Plant. • MDF Core + face dryers. • Services + utilities to the above, mainly: o Electrical distribution MCC’s o Compressed air o Water treatment systems o Fire detection + suppression o Natural Gas o Steam Project Shine has commenced the construction phase of Project Shine and proposals are sought for the supply of Fire Protection and Suppression to the various plant, equipment and buildings. The scope involves designing the fire protection systems to deliver the required volumes and density in order to comply with relevant standards. Medite DAC complies with NFPA standards and all equipment/pipework/valves/fittings etc are all FM approved. Existing Setup MEDITE’S existing fire mains schematic can be seen in Appendix 3. The system is designed to and complies with NFPA standards. The system comprises of: • 1 no. 1,500 GPM/125 PSI Mather + Pratt electric pump. • 1 no. 1,500 GPM/125 PSI Mather + Pratt diesel pump. • 200mm diameter ring main. • Various PIV, AV’s and fire hydrants. • The system is configured as a dry system. Scope of work The Scope of Work is to design, supply + install fire suppression/protection to the following areas: 1) Wet Fuel Equipment (estimated availability date Jun’27): o Wet Fuel from yard system o On-site Chipping System o Chipped Truck Delivery System o 51.270 Reject conveyor head + tail deluge (push button from control room) o 51.310 Tube conveyor feeding existing line #2 energy plant head + tail deluge (push button from control room) o 51.250 Tube conveyor feeding energy plant walking floor head + tail deluge (push button from control room) 2) Dry Fuel System (estimated availability date Jun’27): o 1 no. Edge Trim Silo: o 1 no. Dust Silo o Supply to each spark extinguisher spray nozzle (where runs are external the ne
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 24. August 2026.
- Who is the contracting authority?
- The contracting authority is Ardrahan NS Board of Management.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.