St Joseph's Secondary School BallybunionBallybunionTED
Climate Summer Works: Roof replacements and energy efficiency upgrades at St. Joseph’s Secondary School and the adjacent former Convent Building in Ballybunion, Co. Kerry.
Replacement of roof weathering membranes and installation of upgraded thermal insulation; replacement of existing rooflights and ceilings; wall insulation upgrades; and the full renewal of all rainwater goods to enhance energy performance.
Roofing, Waterproofing & Insulation, Glazing
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- St Joseph's Secondary School Ballybunion
- Published:
- August 19, 2026
- Deadline:
- September 02, 2026
- Topic:
- Roofing
- Object:
- Schule
Object classification
- SchulePrimary
Tender description
Replacement of roof weathering membranes and installation of upgraded thermal insulation; replacement of existing rooflights and ceilings; wall insulation upgrades; and the full renewal of all rainwater goods to enhance energy performance.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
9View CfT Workspace
St Joseph's Secondary School (Ballybunion)Deadline: Aug 19Replacement of roof weathering membranes and installation of upgraded thermal insulation; replacement of existing rooflights and ceilings; wall insulation upgrades; and the full renewal of all rainwater goods to enhance energy performance.Works to Façade of St Joseph’s Building at St.Angela's Secondary School, Ursuline Convent, Waterford
St. Angela's Secondary School (Ballytruckle)waterfordDeadline: Jul 27The project comprises external refurbishment works to the existing school building, including the careful removal and disposal of existing defective render to the front and side elevations. The works include preparation of the underlying substrate and the application of a new breathable lime render system in accordance with the project specifications. The works further include the removal and replacement of existing rainwater goods, including gutters, downpipes, brackets, fixings and associated fittings, together with all necessary making good works. The project also includes the removal and replacement of defective window lintels, including all necessary temporary support works, localised opening-up works, reinstatement, repairs and making good to adjoining finishes. The Contractor shall carry out all works within a live school environment and shall allow for all necessary protection, access equipment, scaffolding, temporary works, dust suppression, safety measures, hoarding and phasing required to safely complete the works with minimal disruption to school activities. The works shall include all ancillary and associated works necessary for the proper completion of the project.Summer Works relating to replacement of existing roof coverings containing asbestos materials at Quignamanger NS, Creggs Road, Ballina, Co. Mayo, F26YX95
Quignamanger NS (The Quay NS)BallinaDeadline: Jul 27Replacement of existing roof coverings containing asbestos at Quignamanger NS, Ballina, Co. Mayo. Existing pitched roof sheets in poor condition; bitumen felt under flat roofs contains asbestos. Emergency cleaning of debris. Dispose of asbestos at licensed facility. Provide new concrete roll tiles to pitched roof (S.R.82-2017). New Alkorplan to flat roof sections. New seamless rainwater goods (gutters, downpipes, fascias, soffits). Replace dome roof lights and provide electric roof lights with wall switches. Make good ceilings and walls damaged by water ingress.Refurbishment and thermal upgrade of existing science rooms at St Jarlath’s College, Tuam, Co. Galway
St. Jarlath’s CollegeTuam, Co. GalwayDeadline: Jul 24Demolition works including, Removal of all gas, electrical and drainage pipework Demoltion and removal floor finishes, fittings etc. as indicated Demoltion and removal of all fitted furniture Removal of all wet insulation from the attic Construction works including Construct new internal chemical store Insulation of the external walls and over ceilings Construct internal walls, floors, roofs, fittings etc. as indicated New finishes and services New fixed furniture Painting and decorating Roof Repairs at the soffit and gable Services Trenches within ground floor science rooms for electricity and gas Cores in the concrete first floor electricity and gas Four pipes to bring the fume cupboard and chemical store extranct to the outside. Services as outlined on Mechanical and electrical drawings and specification, to extension and existing Provision of 3No. Fume CupboardsProposed Infrastructure Rehabilitation, Watermain replacement and General Upgrade Works at IDA Clonshaugh Business and Technology Park, Dublin 17
IDA IrelandDublinGeneral upgrade of the infrastructure within the Business Park including remedial and upgrade works to the road and footpath networks and replacement of the existing internal watermain (4.8km approx. total length) and reconnection of all internal units, CCTV installation and general siteworks“Request for Tender for Roof Repairs at An Grianán Adult Education College, Termonfeckin, Co. Louth”
The Countrywomens TrustTERMONFECKINDeadline: Sep 15Roof repair and associated works at An Grianan. The works include removal of existing damaged roof materials, installation of a new roofing system, flashing, waterproofing, insulation, rainwater goods and all necessary ancillary works to complete the project. The contractor will be responsible for site setup, safety management, waste disposal and compliance with all relevant building regulations. This is a single lot works contract and will be awarded on the basis of the Most Economically Advantageous Tender using a 70 percent price and 30 percent quality weighting.RFT 02/26/GM - Works Contractor and PSCS for ATU Dublin Road EEDPP2 Energy Retrofit at Atlantic Technological University at the Galway City Campus
Atlantic Technological UniversityLetterkennyDeadline: Sep 21Atlantic Technological University (ATU) is seeking suitably qualified and experienced contractors to undertake an energy retrofit project at its Galway City Dublin Road Campus. The project comprises the retrofit of approximately 4,425m² of the original 1972 building and forms part of the Higher Education Authority (HEA) and Sustainable Energy Authority of Ireland (SEAI) funded Energy Efficiency and Decarbonisation Pathfinder Project (EEDPP2). The works include building fabric upgrades, roof and window replacement, ventilation improvements, lighting and controls upgrades, and the installation of a medium-temperature air-source heat pump, with existing gas boilers retained for peak demand and backup. The project aims to improve energy efficiency, reduce carbon emissions, extend the building's operational life, enhance occupant comfort, increase the use of renewable technologies, and achieve a minimum B1 BER rating. The existing building is a reinforced concrete framed structure currently served by the campus central heating system and a combination of natural and mechanical ventilation systems.Contract for Building Works at Port Centre for Dublin Port Company
Dublin Port Company_411DublinThe work will include the appointment of a contractor to carry out: - Fire Cert and associated works. - DAC and associated works. - New alterations to the ground floor, reception, and mezzanine. - Essential repair works to the fifth floor to improve insulation and resolve water ingress issues. - Upgrade the fifth floor by removing and raising the existing roof, replacing the external façade with a new louvred façade allowing the floor plate to extend out to the perimeter - Upgrade building fabric and services to meet 2050 energy targets. - Alterations to lower ground floor to include new shared facilities, larger meeting room, changing facilities, etc - Office internal fit-out and new partitions and ceilings are to be upgraded. - MEP works: - Update Fire Alarm - Install Fire Fighting Lift - Install Smoke Extract System - Update Fire Fighting Services Generator - Update Services Local to Core - Ventilation, Water, Lighting - Upgrade M and E services to each floor plate to suit the new building envelope façade design. - Upgrade to M and E central plant (i.e. central heat pump etc.) - Upgrade sub-metering to tenant zones is required. - Provision of PV array to assure compliance with CAP 2030-2050 - External works.Remedial works and upgrade to existing flat roof area including associated builders work at Colaiste na Sceilge Cahersiveen Co.Kerry.
Kerry Education and Training BoardTraleeDeadline: Sep 08On behalf of Kerry Education and Training Board you are invited to tender for the proposed Summer Works Project Involving remedial works and upgrade to existing flat roof area including associated builders work as specified on project drawing and other tender documents, Colaiste na Sceilge Garranebane Caherciveen Co. Kerry in accordance with the accompanying Instructions to Tenderers and tender documents. Please refer to the attached schedule of documents and drawings for the full listing of tender documents. Your tender should include the following documents. • Signed Declaration of Suitability for Contractors for Small Works • Signed Volume B Form of Tender and Schedule • Signed Volume C Pricing Document and Schedule of Prices Tenderers are strongly advised to visit and check the site relative to all aspects of the work and include for same in their tender. No claims whatsoever will be entertained by the Engineer due to the lack of knowledge of site conditions or existing installations.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 02. September 2026.
- Who is the contracting authority?
- The contracting authority is St Joseph's Secondary School Ballybunion.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.