James's Street CBS Secondary SchoolDublin 8TED
CBS James Street refurbishment works to 1 no Science Lab and 2 existing rooms
Umbauarbeiten an einem Naturwissenschaftslabor und zwei bestehenden Räumen an der CBS James Street Secondary School.
Non-Residential Building
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- James's Street CBS Secondary School
- Published:
- July 16, 2026
- Deadline:
- August 12, 2026
- Topic:
- Non-Residential Building
- Object:
- Schule
Object classification
- SchulePrimary
Tender description
Umbauarbeiten an einem Naturwissenschaftslabor und zwei bestehenden Räumen an der CBS James Street Secondary School.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
9Refurbishment works to 2no. Science labs, prep room and existing rooms at Stanhope Secondary School, Manor St, Stoneybatter, Dublin 7.
St. Joseph's Secondary School (Stanhope Secondary School)DublinDeadline: Sep 04Refurbishment works to 2no. Science labs, prep room and existing rooms at Stanhope Secondary School, Manor St, Stoneybatter, Dublin 7.Summer Works relating to the refurbishment of 2 No. science classrooms and roof insulation works
St. Joseph’s Secondary School (Foxford)FoxfordDeadline: Jul 27Renovierung von zwei naturwissenschaftlichen Fachräumen (Klassenzimmern) inklusive mechanischer und elektrischer Arbeiten sowie vollständiger Ausstattung. Die Arbeiten umfassen auch die Installation von Wand- und Deckenisolierung.Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana
Scoil Mhuire (Buncrana)BuncranaDeadline: Jul 31Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana. See cover letter for full description of works.Refurbishment and thermal upgrade of existing science rooms at St Jarlath’s College, Tuam, Co. Galway
St. Jarlath’s CollegeTuam, Co. GalwayDeadline: Jul 24Demolition works including, Removal of all gas, electrical and drainage pipework Demoltion and removal floor finishes, fittings etc. as indicated Demoltion and removal of all fitted furniture Removal of all wet insulation from the attic Construction works including Construct new internal chemical store Insulation of the external walls and over ceilings Construct internal walls, floors, roofs, fittings etc. as indicated New finishes and services New fixed furniture Painting and decorating Roof Repairs at the soffit and gable Services Trenches within ground floor science rooms for electricity and gas Cores in the concrete first floor electricity and gas Four pipes to bring the fume cupboard and chemical store extranct to the outside. Services as outlined on Mechanical and electrical drawings and specification, to extension and existing Provision of 3No. Fume CupboardsRefurbishment of existing municipal building to 2 number apartment units, and a rear first floor extension and all associated works.58 Mayorstone Drive Limerick.
Limerick City and County Council_103432Limerick.Deadline: Sep 09This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposedN4/2/219 - Architect led Design Team for project (21 No. Social Housing units including the refurbishment and re-use of 4 No. existing buildings and associated site works) at Bantry, Co. Cork
Cork County CouncilCorkDesign Team Services as per the attached documents on eTenders.Lot 1 - Architect (Design Team Lead). St Joseph Street 3 no 1 Bed units, in a single structure end of terrace, to match existing terraced units, St Joseph Street Limerick Design Consultancy Services
Limerick City and County Council_103432Limerick.Lot 1 - Architect (Design Team Lead). St Joseph Street 3 no 1 Bed units, in a single structure end of terrace, to match existing terraced units, St Joseph Street Limerick Design Consultancy Services for Affordable and Social Housing Projects, Limerick City and County Council Including design certifier, assigned certifier, preparation of FSC and DAC, and appointment of lead consultant advertised as PSDP.Neubau Geschwister-Scholl-Schule mit einer 2-fach Sporthalle - Bereitstellung eines Grundstücks und/oder Investorenmodell
Immobilien- und Abwasserbetrieb der Hansestadt Herford, Sparte ImmobilienHerfordMarkterkundung zum Ersatzneubau der Geschwister-Scholl-Schule mit 2-fach Sporthalle. Das Immobilien- und Abwasser-Betrieb (IAB) Herford beabsichtigt die Realisierung eines modernen, nachhaltigen Ersatzneubaus der Geschwister-Scholl-Realschule einschließlich einer 2-fach Sporthalle an einem zentrumsnahen Standort im räumlichen Umfeld des bestehenden Schulstandortes. Die Schule befindet sich aktuell im südöstlichen Bereich des Planungsbezirkes Zentrum. Es wird ein geeignetes Baugrundstück inPlanung und Bau des Neubau Gymnasium am Schulcampus Oldenburg i.H.
Stadt Oldenburg in HolsteinOldenburg in HolsteinDeadline: Aug 13Neubau des Gymnasiums am Schulcampus Oldenburg i.H. als Teil des Gesamtprojekts 'Schulcampus Oldenburg in Holstein'. Der Neubau wird auf dem ehemaligen Sportplatz errichtet und umfasst die Einrichtung von Fachklassen, Freianlagen und Infrastrukturen. Der Bauabschnitt ist Teil des 2. Bauabschnitts des Gesamtprojekts und soll im Jahr 2026 beginnen.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 12. August 2026.
- Who is the contracting authority?
- The contracting authority is James's Street CBS Secondary School.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.