New: market reports on German public procurement Read the report

Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO)Den HaagTED

Building Flood Resilience with Nature Based Solutions in Tula River System, Mexico

Mexico is seeking to transition toward a modern flood management model that integrates controlled flood zones, restored floodplains, and nature-based solutions, following recent events that have exposed the limitations of traditional grey infrastructure. In this context, the Tres Culturas corridor in the Tula River basin presents a unique...

Submission deadline: October 07, 2026Type: Tender

Environmental Assessment, Landscape Architecture, Water Resource Management

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO)
Published:
September 06, 2026
Deadline:
October 07, 2026
Topic:
Environmental Assessment

Tender description

Show full description

Mexico is seeking to transition toward a modern flood management model that integrates controlled flood zones, restored floodplains, and nature-based solutions, following recent events that have exposed the limitations of traditional grey infrastructure. In this context, the Tres Culturas corridor in the Tula River basin presents a unique opportunity to demonstrate this shift in practice: a designed floodplain that reduces urban flood risk while generating ecological, cultural, and social benefits. Aligned with the restoration of the Tula River, one of the President’s 100 national commitments, the project has the potential to become a flagship success case and catalyze large-scale transformation in flood management across Mexico. To realize this opportunity, this assignment aims to contract a single qualified party, a principal contractor–subcontractor structure, or a consortium to provide technical and operational advice for the design of nature-based solutions addressing the hydrodynamics of the Tula River in the Tres Culturas Corridor. The core of the assignment will be to transform modelling data (provided by Inter American Development Bank -IDB-) into a safe, implementable and institutionally supported design, ensuring measurable reductions in flood risk while integrating long-term environmental and social co-benefits. The purpose of the project, its goals, activities and deliverables are outlined in the terms of reference, which is attached as Appendix 1. The content of this ToR document is not final and may be modified by RVO in case of a tender. In case you possess demonstrable experience in similar projects you are invited to express your interest to the contact person mentioned below. Please fill out the questions outlined in the table on the next page. €110.600

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

5 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

10

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 07. Oktober 2026.
Who is the contracting authority?
The contracting authority is Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO).
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "Building Flood Resilience with Nature Based Solutions in Tula River System, Mexico" from Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO) and keep track of deadlines and submission guidelines.

Deadline tracked until October 07, 2026No credit card required