EWN Entsorgungswerk für Nuklearanlagen GmbHRubenow
Auspflocken der Trinkwasserltg. WWLo
Auspflocken der Trinkwasserltg. WWLo Auspflocken der Trinkwasserltg. WWLo
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- EWN Entsorgungswerk für Nuklearanlagen GmbH
- Published:
- August 27, 2026
- Deadline:
- Not specified
Tender description
Auspflocken der Trinkwasserltg. WWLo Auspflocken der Trinkwasserltg. WWLo
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Related tenders
9Erneuerung der Schaltanlage und Steuerungstechnik einschließlich Anpassung der Prozessvisualisierung - Wasserwerk Lodmannshagen (WWLo)
EWN Entsorgungswerk für Nuklearanlagen GmbHRubenowErneuerung der Schaltanlage und Steuerungstechnik einschließlich Anpassung der Prozessvisualisierung - Wasserwerk Lodmannshagen (WWLo)Vertrag für die Kalibrierung von Containerwaagen
EWN Entsorgungswerk für Nuklearanlagen GmbHRubenowDeadline: Sep 07Vertrag für die Kalibrierung von Containerwaagen 2027 bis 2030 Vertrag für die Kalibrierung von ContainerwaagenEvakuierungsarbeiten von Pipelines zum Gastransport, Abfackeln von Restmengen, Inertisieren von Pipelines zum Gastransport: Stegal Loop
GASCADE Gastransport GmbHKasselDeadline: Sep 24Gegenstand des Vorhabens ist die fachgerechte Evakuierung, das Abfackeln von Restmen-gen und die anschließende Inertisierung des Leitungsabschnitts "STEGAL Loop" zwischen der Absperrstation Dürrengleina und der Absperrstation Wolfsbehringen. Ziel ist die vollständige Außerbetriebnahme des Leitungsabschnitts durch weitgehende Entfernung des vorhandenen Erdgases und anschließende Befüllung mit Stickstoff als Inertgas. Die Maßnahme betrifft ei-nen ca. 97 km langen Leitungsabschnitt der Nennweite DN 1000 und soll im September 2027 durchgeführt werden. Dieser Auftrag unterliegt dem Bundestariftreuegesetz (BTTG) vom 30.04.2026 (BGBl. 2026 I Nr. 119). Bieter werden darauf hingewiesen, dass die Ausführung dieses Auftrags an die Ver-pflichtung geknüpft ist, den eingesetzten Arbeitnehmerinnen und Arbeitnehmern mindestens die tariflichen Arbeitsbedingungen zu gewähren, die in einer gemäß § 5 BTTG für die ausge-führten Tätigkeiten einschlägigen Rechtsverordnung festgesetzt sind. Mit Angebotsabgabe ist eine entsprechende Erklärung (Tariftreueversprechen) abzugeben. Diese Verpflichtung wird verbindliche Ausführungsbedingung des Vertrages.Bodenuntersuchungsbohrungen sowie die Durchführung von Konusdrucksondierungen mit Porenwasserdruckmessung (PCPT) und die damit verbundenen geotechnischen Laboruntersuchungen. Es sind zwei geotechnische Bohrungen bis zu einer Tiefe von ca. 30 m unterhalb der Schlammlinie/des Meeresbodens durchzuführen. Die Standorte der Bohrungen befinden sich nördlich der Insel Norderney.
AquaDuctus Pipeline GmbHKasselSehr geehrte Damen und Herren, wir kontaktieren Sie heute im Rahmen einer unverbindlichen Markterkundung im Bereich Bodenuntersuchungsbohrungen sowie die Durchführung von Konusdrucksondierungen mit Porenwasserdruckmessung (PCPT) und die damit verbundenen geotechnischen Laboruntersuchungen. Es sind zwei geotechnische Bohrungen bis zu einer Tiefe von ca. 30 m unterhalb der Schlammlinie/des Meeresbodens durchzuführen. Die Standorte der Bohrungen befinden sich nördlich der Insel Norderney. Die Wassertiefe an beiden Standorten beträgt 4–6 m. Der Zweck der Arbeiten ist • die Identifizierung der Bodenschichten. • Ermittlung der geotechnischen Parameter, die für die detaillierte Planung des Tunnels erforderlich sind • Ermittlung der geotechnischen Auslegungsgrundlagen für die Bodenverhältnisse entlang des Tunnelabschnitts, die für die Auslegung erforderlich sind. Der Auftragnehmer wird hiermit darauf hingewiesen, dass sich beide Standorte in einem Nationalpark befinden und dass es einschränkende geografische Faktoren gibt, die die Ausführung der Arbeiten beeinträchtigen können, darunter: • Geringe Wassertiefe / Gezeitenbereich • Umweltschutzzonen • Wind und Wellen Die benötigten Genehmigungen für die Arbeiten werden vom Auftraggeber beigebracht. Standortfreigabe hinsichtlich nicht explodierter Kampfmittel (UXO) Der Auftragnehmer hat ausreichende Maßnahmen zu ergreifen, um sicherzustellen, dass das Risiko, an den vorgeschlagenen Standorten auf Blindgänger zu stoßen, für die Art der auszuführenden Arbeiten akzeptabel ist. Anforderungen an die geotechnische Untersuchung Die Bodenuntersuchungsbohrungen sind gemäß DIN EN ISO 22475 durchzuführen. Die CPT-Untersuchungen sind gemäß DIN 4094-1 und DIN EN ISO 22476-1 durchzuführen. Anforderungen an geotechnische Prüfungen Nach Durchführung der Erkundungen und Auswertung der Bohrkerne sind die Laboruntersuchungen gemäß den ISO- und DIN-Spezifikationen für die jeweilige Prüfung durchzuführen. Das Laboruntersuchungsprogramm wird vomGas and Electricity Infrastructure Technical Services Single Supplier Framework
Sustainable Energy Authority of IrelandDublinDeadline: Sep 15The objective of this CfT is to invite proposals from suitably qualified services providers to establish a single supplier framework for technical engineering services to execute the technical monitoring role, on behalf of Ireland as set out below. Under Article 22 of Regulation (EU) No 1316/2013, establishing the Connecting Europe Facility (CEF), Ireland is required to undertake Technical Monitoring and Financial Control of actions in close cooperation with the European Commission, to certify that expenditure incurred in respect of projects or parts thereof have been disbursed, and that the disbursement was in conformity with the relevant rules. The latest version of Article 22 (Regulation (EU) No 2021/1153) requires that the performance reporting system shall ensure that data for monitoring the implementation and the results of the CEF are suitable for an in-depth analysis of the progress achieved, including for climate tracking, and that they are collected efficiently, effectively and in a timely manner. SEAI requires a technical engineering service to execute the technical monitoring task, on behalf of Ireland as the member state, for the certifying of claims for energy projects receipt of funding under the CEF. For further information please see Request for Tender at www.etenders.gov.ie.Provision of Marine Surveys for Biological Data Collection within the South Coast Designated Maritime Area Plan
Department of the Environment Climate and CommunicationsDublinThe Minister for the Climate, Energy and the Environment (DCEE) invites interested parties to submit responses to this request for tender for a desktop study for best practice methodology for characterising the migratory patterns of for birds (waterbirds and seabirds, passerine birds), digital aerial surveys for birds and marine mammals, benthic habitat survey over the SC-DMAP area and environs as specified within each lot. The SC-DMAP is situated off the coast of County Cork, Waterford and Wexford. As part of a new plan-led regime, the offshore wind Phase Two policy approved by Government in March 2023 requires that all future offshore renewable energy developments in Ireland will take place within Designated Maritime Area Plans (DMAPs), which will be established according to provisions in the Maritime Area Planning Act, 2021. Specifically, all future developments will take place at specific sites within DMAPs that have been identified for this purpose by Government. In October 2024, the Minister for the Environment, Climate and Communications made the South Coast Designated Maritime Area Plan for Offshore Renewable Energy (SC DMAP), following the approval of both Houses of the Oireachtas. The first offshore wind project with a capacity of approximately 900MW will take place in Tonn Nua and will aim for deployment by 2030.ALSAG Sammeluntersuchung Altstandorte Hartberg-Fürstenfeld, Bohrleistungen
Land Steiermark - Land SteiermarkGrazBohrleistungen im Rahmen von Untersuchungen gemäß ALSAG im Projekt „Altstandorte Hartberg-Fürstenfeld“Purchase of Sleeves, Split Tees incl. Hot Tapping and Stopple Services and Methane Re-compression Services - 25/18597
EnerginetFredericiaDeadline: Sep 30The Contracting Authority intends to procure components and associated services for Energinet’s gas-related infrastructure and facilities. The tender consists of two separate Framework Agreements: •LOT 1 - Purchase of Sleeves, Split Tees incl. Hot Tapping and Stopple Services •LOT 2 - Methane Re-compression Services For each LOT, the Contracting Authority intends to award Framework Agreements to two Suppliers. The Framework Agreements have a duration of eight (8) years and may be terminated by either Party upon six (6) months' written notice, cf. section 9.3 of the applicable Framework Agreement. The Framework Agreements are intended to support operations, maintenance activities and projects concerning Energinet’s gas-related infrastructure and facilities. Energinet Gastransmission A/S is expected to award the majority of subsequent contracts under the Framework Agreements. The Framework Agreements may also be used by other subsidiaries within the Energinet Group in accordance with the provisions of the applicable Framework Agreement. It is expected that the Framework Agreements will primarily be used by Energinet Gastransmission A/S and Gas Storage Denmark A/S. The Framework Agreements may also be used by Energinet Brint A/S should a relevant need arise during the term of the Framework Agreements. The estimated and maximum values of each LOT are stated below. The estimates have been calculated based on historical consumption combined with the anticipated requirements during the term of the Framework Agreements. The stated consumption figures and values are estimates only and are therefore not binding on the Contracting Authority. During the term of the Framework Agreements, the Contracting Authority has the right, but not the obligation, to purchase the goods and services covered by the Framework Agreements from the selected Suppliers, cf. section 1.3 of the applicable Framework Agreement.Vergabeverfahren Totalübernehmer „Neubau KIBE in Verbindung mit der Sanierung der Volksschule Ungenach inkl. Erweiterung für GTS-Bereich (Freizeit/Ausspeisungsraum)“
Gemeinde UngenachUngenachDer Auftraggeber, die Gemeinde Ungenach, beabsichtigt am Planungsgebiet den Neubau der 5-gruppigen Kinderbetreuungseinrichtung in Verbindung mit der Sanierung der Volksschule Ungenach inkl. Erweiterung für GTS-Bereich (Freizeit/Ausspeisungsraum). Die Beilagen Machbarkeitsstudie, Musterraumprogramm_KIGA_KS_Ungenach, Musterraumprogramm_VS_Ungenach_4_Klassen, Plan Volksschule sind zu beachten (siehe 06_Beilagen).
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is EWN Entsorgungswerk für Nuklearanlagen GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.