Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
Adaptation, Refinement and Implemantation of a LNOB Training Course
Review, refinement and adaptation of course material to the requirements outlined in the TOR in hand (incl. conceptualisation of a webinar) Implementation of training
Vocational Training, E-Learning, Seminars
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Published:
- July 08, 2026
- Deadline:
- Not specified
- Topic:
- Vocational Training
Tender description
Review, refinement and adaptation of course material to the requirements outlined in the TOR in hand (incl. conceptualisation of a webinar) Implementation of training
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock2 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Procedure data
Unlock4 details capturedPublication number · Procedure type · Contract type · Regulation level
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock2 details capturedBidders and contractors · Address
Related tenders
5Procurement of courses in Hostile Environment Awareness Training (HEAT)
ForsvarsmateriellOSLODeadline: Aug 17The objective of the Framework Agreement is to ensure that personnel carry out the necessary security training before service, assignment or travel to areas marked by armed conflict, instability or increased security risk. The courses shall provide participants with knowledge and skills that reduce the risk to life and health and strengthen the ability to manage threats and critical events in such environments. See Annex B (requirement specification) for a more detailed description of the scope of the procurement.Multi Supplier Framework for The Supply and Delivery of Apprenticeship Course Materials for Letterkenny and Gweedore Training Centres
Donegal Education and Training Board_368LetterkennyMulti Supplier Framework for The Supply and Delivery of Apprenticeship Course Materials for Letterkenny and Gweedore Training CentresProvision of Training and Learning Development Programme Services
Digital Manufacturing IrelandLimerickDeadline: Aug 10In summary, the Services comprise: the provision of Training and Learning Development Programme Services (Learning Design, Content Development, Skills-Pathway Development and AI-Literacy Pathways) as outlined and described at Appendix 1. This procurement is conducted in accordance with the provisions of Directive 2014/24/EU as implemented in Ireland by the European Union (Award of Public Authority Contracts) Regulations 2016 (S.I. No. 284 of 2016), and specifically under the Light Touch Regime (LTR) applicable to certain social and other specific services.10004007 1-Provision of Technical Expert Support on Climate Change Adaptation and Climate Finance in Central and West Africa
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21In this work package, the contractor in collaboration with the African Development Bank will identify and work with project applicants from the pool of projects generated by the national climate funds, financed by GIZ. The contractor and AfDB will identify small-scale high-impact highly replicable climate change adaptation demonstration projects, that are suitable for AfDB"s Adaptation Benefits Mechanism (ABM), seeking to mobilize higher amounts of funding than available through the PACO small grants from Output 3. The specific objective is to establish and implement four new and fully validated ABM-Projects, developed according to the ABM Activity Cycle, that will catalyse up to four million Euro of public or private money via the issuance of Certified Adaptation Benefits (CAB). The basis for the four ABM Projects to develop are the identified projects from Output 3 suitable for an ABM Activity. To obtain the CABs, issued by the AfDB and the goal of the activity, the contractor must in collaboration with AfDB, guide the ABM Activity Participants during the ABM Activity Cycle. Both the small-scale adaptation project, implemented by the project developer under Output 3 and financed by GIZ (responsibility of GIZ), and the demonstration of the ABM must be fully implemented within the project duration (responsibility of the contractor). The contractor will be responsible for undertaking all activities necessary to establish and demonstrate four ABM Activities, in Benin, Ivory Coast, Senegal and Republic of Congo, which will lead to the issuance of Certified Adaptation Benefits by the African Development Bank. The contractor accordingly will deliver advisory services, technical and process-related assistance, deliver basic studies, and develop ABM Methodologies during the ABM Activity Cycle to the four identified ABM Participants. The African Development Bank will provide guidance and advise on the ABM components. Promote and catalyse adaptation financing in Benin, CôteDevelopment of a green corridor project and street design training in Dakar
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 28Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.