Offaly County Council_448TullamoreTED
2026 Offaly County Council Housing Maintenance: Pre-let Repair Term Maintenance and Refurbishment Works on Council owned housing stock using the Multi Party Framework Agreement
Offaly County Council establishes a multi-party Framework Agreement for term maintenance and refurbishment on council housing stock. Approximately 35 properties (mainly vacant) over 1 year: 30% major works (EWI, re-plumb, rewire, windows/doors, heat pump, kitchen, bathroom, fencing, painting), 70% standard works (boiler service, window/do...
Facades & Plastering, Plumbing, Heating & Air Conditioning, Electrical Installation, Residential Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Offaly County Council_448
- Published:
- June 04, 2026
- Deadline:
- June 26, 2026
- Topic:
- Facades & Plastering
- Object:
- Wohnhaus / Einfamilienhaus
Object classification
- Wohnhaus / EinfamilienhausPrimary
Tender description
Offaly County Council establishes a multi-party Framework Agreement for term maintenance and refurbishment on council housing stock. Approximately 35 properties (mainly vacant) over 1 year: 30% major works (EWI, re-plumb, rewire, windows/doors, heat pump, kitchen, bathroom, fencing, painting), 70% standard works (boiler service, window/door servicing, kitchen/bathroom repairs, attic insulation, electrical checks, alarms, immersion, internal doors, painting, fencing, waste removal). Framework of 12 participants plus 5 reserves, ranked by lowest price, awarded via Option C (application of framework rates). Process begins with property inspection.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County CouncilCorkDeadline: Jun 26Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement.Multi-Party Framework Agreement for Response Maintenance Works for Kildare County Council - Electrical Works 2025
Kildare County Council_385NaasKildare County Council schreibt einen Multi-Party-Rahmenvertrag für elektrotechnische Instandhaltungsarbeiten aus. Die Arbeiten umfassen Reaktionsinstandhaltungen an Wohnungen oder anderen Gebäuden (leerstehend oder bewohnt). Das Vorhaben ist in 3 Lose aufgeteilt, mit einem geschätzten Gesamtwert von 2.000.000 € pro Los über 2 Jahre. Rahmenvertrag beginnt Q4 2025, initial 12 Monate, optionaler Verlängerung um weitere 12 Monate. Aufträge werden über Einzelabrufe im Term Maintenance and Refurbishment Works Contract vergeben.Multi-Party Framework Agreement for Response Maintenance Works for Kildare County Council - Plumbing Works 2025
Kildare County Council_385NaasKildare County Council schreibt einen Rahmenvertrag für Instandsetzungsarbeiten (Plumbing Works) aus, aufgeteilt in 3 Lose. Arbeiten an Wohnungen und anderen Gebäuden (leerstehend oder bewohnt). Geschätzter Gesamtwert: €2.000.000 pro Los über max. 24 Monate. Beginn: Q4 2025. Vergabe über Einzelaufträge (Task Orders). Auftragnehmer muss die Rolle des PSCS übernehmen.Multi-Party Framework Agreement for Response Maintenance Works for Kildare County Council – General Building Works 2025
Kildare County Council_385NaasDas Kildare County Council plant ein Multi-Party-Rahmenabkommen für allgemeine Instandhaltungs- und Bauarbeiten an bewohnten oder leerstehenden Gebäuden. Die Vergabe erfolgt in 3 Losen mit einem geschätzten Volumen von je 2.000.000 € über 2 Jahre. Der Auftragnehmer übernimmt die Rolle des Project Supervisor Construction Stage (PSCS). Beginn ist für Q4 2025 geplant, Laufzeit 12 Monate mit Verlängerungsoption um weitere 12 Monate. Die Beauftragung erfolgt über Einzelaufträge.Multi-Party Framework for Maintenance Repairs and Replacement of heating systems Limerick City and County Council 2026
Limerick City and County Council_103432Limerick.Deadline: Jul 31Limerick City and County Council schreibt einen Rahmenvertrag für die Wartung/Reparatur/Ersatz bestehender Gas- und Ölkessel und zugehöriger Ausrüstung auf reaktiver Basis im gesamten kommunalen Wohnungsbestand aus.DLR Co Co -Single Party Framework Agreement for Public Lighting and Electric Vehicle Charging Infrastructure Maintenance and New Works for Dun Laoghaire Rathdown County Council
Dun Laoghaire-Rathdown County CouncilDún LaoghaireDeadline: Jul 13This tender will lead to the contract for the maintenance of the public lighting assets and council owned and maintained EV charging units for Dun Laoghaire Rathdown County Council.DLR Co Co - Multi-Party Framework Agreement for the Construction of Public Parks and Related Works for Dún Laoghaire Rathdown County Council (2026 to 2030) Initial Project: The Metals Green
Dun Laoghaire-Rathdown County CouncilDún LaoghaireDeadline: Jun 10The Metals Green, Dún Laoghaire: construction of a new 3,500m² public park on a green field site. Works include earthworks, paving, in-situ concrete wall, railing, pavement works, drainage, SuDs, public lighting, granite edging/wall/seating features, soft landscaping.Generalunternehmerleistungen zur Sanierung des Wohnquartiers Bonhoefferstraße 5-14, Stauffenbergstraße 1-23 in 04509 Delitzsch (VOEK 447-25)
Bundesanstalt für ImmobilienaufgabenBonnSanierung von 209 Bestandswohnungen (5 Gebäude, 5 Vollgeschosse, ~13.650 m² Wohnfläche) in Delitzsch. Modernisierung mit Aufzügen, neuen Balkonen, Grundrissänderungen, PV-Anlagen, Aufwertung der Freianlagen. Umsetzung blockweise in bis zu 3 Bauabschnitten im leergezogenen Zustand.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 26. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Offaly County Council_448.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.