Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornTED
Provision of standardised consultancy services for On- & Off-Grid Regulation and Market Development
Under the GIZ initiative GET.transform, the contractor will support partner countries and regions in advancing the global energy transition through technical assistance and advisory services. The focus areas are On-Grid Regulation and Market Development and Off- Grid Regulation and Market Development. The contractor will provide expert se...
Projektmanagement, Verwaltungsberatung, Unternehmensberatung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Veröffentlicht:
- 27. August 2026
- Frist:
- 29. September 2026
- Thema:
- Projektmanagement
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
Under the GIZ initiative GET.transform, the contractor will support partner countries and regions in advancing the global energy transition through technical assistance and advisory services. The focus areas are On-Grid Regulation and Market Development and Off- Grid Regulation and Market Development. The contractor will provide expert services, ensure flexibility to adapt to evolving needs, and contribute to achieving the overall programme objectives. GIZ will manage implementation jointly with local partners (worldwide), with English as the main working language, although other languages may be required depending on the project context. Regular coordination formats-such as weekly meetings and interim reports-will be established at the start of the assignment. Specific activities and expert assignments will be defined progressively based on partner requests. Objectives and Expected Results The contractor will strengthen the technical and institutional capacities of partner countries on On- and Off-Grid Regulation and Market Development. These areas represent the essentials to create the regulatory base and needed market mechanisms to transform towards a well-established and framework-based energy transition. 1. On-Grid Regulation and Market Development Objective and Scope The goal is to enable renewable energy participation and investment by developing and re-designing power markets and the reconsideration of traditional business models and power sector regulatory frameworks. Approach Partner countries face diverse challenges on regulatory frameworks and power markets- Support activities may include: - Renewable Energy Procurement and Transaction Advisory: Support governments and public institutions in designing and implementing renewable energy procurement programmes by strengthening policy, regulatory, financial, and governance frameworks. Services include auction and tender design, IPP procurement and transaction advisory, PPA negotiations, risk mitigation strategies, and stakeholder capacity building - Renewable Energy Distributed Generation: Provide advisory services for the development and implementation of market-driven distributed generation frameworks, including the assessment and design of regulatory models. Support policy development, regulatory reforms, programme implementation, and capacity building to accelerate DG deployment. - Power Market Reform: Advise on the design and implementation of power market reforms that improve market efficiency, transparency, and investment attractiveness. Services include tariff and market mechanism design, regional market integration, cross-border trade facilitation, and the development of regulatory frameworks that enable renewable energy integration and private sector participation. 2. Off-Grid Regulation and Market Development Objective and Scope The aim is the development of pathways and plans to extend interconnected distribution grids and isolated mini-grids by addressing implementation issues from a policy and infrastructure perspective. Approach Partner countries face diverse challenges on regulatory frameworks that enable opportunities for electricity access, mini-grid and productive-use projects. Support activities may include: - Electrification Planning and Siting: Support governments in developing integrated electrification plans that identify least-cost electrification pathways through grid extension, mini-grids, and standalone systems. Services include geospatial planning, mini-grid site identification, productive use of energy (PUE) integration, and technical assistance to improve project viability and long-term electrification strategies. - Mini-Grid Frameworks: Develop and implement regulatory, tariff, procurement, and financing frameworks that create an enabling environment for private sector investment in mini-grids. Services include competitive procurement and incentive mechanism design, coordination with financing partners, capacity building, and technical assistance to support sustainable mini-grid market development. - Standalone System Frameworks: Support the development of regulatory and technical frameworks for standalone energy systems that promote market growth while ensuring quality, consumer protection, and regulatory oversight. Services include the design of market rules, technical standards, operational guidelines, and implementation support to enable sustainable standalone energy markets. All interventions will be tailored to each country"s stage in (on- & off-grid) regulation and market development and its broader development objectives. Collaboration and Adaptability The contractor must maintain a flexible and responsive working approach, adapting activities and work plans to changing needs and partner requests. A collaborative management system with GIZ will ensure regular communication, alignment of priorities, and continuous quality assurance. Deliverables Deliverables may include analytical studies, policy and technical recommendations, capacity-building sessions, and communication materials. All outputs will be reviewed and approved by GIZ and its partners before completion. In summary, the contractor will act as a technical partner to GIZ, providing adaptable and high-quality support in on- and off-grid regulation and market development. Through collaborative and capacity-oriented implementation, the work will help partner countries design integrated, sustainable, and low-carbon market reforms and on- and off-grid regulatory frameworks while fostering transparency, knowledge sharing, and long-term national ownership.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
4International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.FOR THE PROVISION OF SERVICES TO SUPPORT THE DEVELOPMENT OF THE ENERGY SERVICE COMPANIES (ESCOS) MARKET AND INDUSTRIAL ENERGY EFFICI ENCY IN ZAMBIA THROUGH POLICY, REGULATORY, FINANCIAL AND AWARENESS INTERVENTIONS
UNIDOPhilippinesFrist: 18. Sept.Tendering Text: FOR THE PROVISION OF SERVICES TO SUPPORT THE DEVELOPMENT OF THE ENERGY SERVICE COMPANIES (ESCOS) MARKET AND INDUSTRIAL ENERGY EFFICIENCY IN ZAMBIA THROUGH POLICY, REGULATORY, FINANCIAL AND AWARENESS INTERVENTIONSProvision of technical advisory services for energy efficiency, renewable energy self-consumption, and institutional capacity development in Kosovo
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 22. Sept.This assignment contributes to the overall objective of the Kosovo Energy Project (KEP) to improve the framework conditions for increasing energy efficiency (EE) and expanding renewable energy for self-consumption (RE-SC) in Kosovo. The contractor shall provide technical advisory services, institutional capacity development and implementation support to partner institutions in close coordination with GIZ and relevant national stakeholders. The contractor shall build on previous project achievements, avoid duplication and ensure complementarity with ongoing national reforms and donor-supported initiatives. The contractor is responsible for contributing to the achievement of the expected results under Outputs 1, 2, 4 and 5 of KEP. Activities under all work packages shall be implemented in an integrated manner to maximise synergies between regulatory reform, financing mechanisms, institutional capacity development and gender-responsive energy transition. Work Package (WP) 1: Legal and Regulatory Framework Objective: Improve the legal, regulatory, and technical framework to enable investments in energy efficiency (EE) and renewable energy sources (RES) for self-consumption. Description: The contractor shall provide technical advisory services to strengthen the legal and regulatory framework for energy efficiency and renewable energy for self-consumption in Kosovo. The assignment includes drafting and reviewing legislation, developing technical standards and supporting partner institutions in implementing the new regulatory framework. The expected result is an improved enabling environment that facilitates public and private investment while ensuring alignment with the EU Energy Acquis and Energy Community obligations. Key Outputs / Activities: - Provide technical advisory services to ME, MESPI and KEEF for the drafting, revision and implementation of legislation and regulatory frameworks on energy efficiency (EE) and the energy performance of buildings (EPB). - Support ME, ERO, DSO and TSO in drafting and amending secondary legislation implementing the Law on Renewable Energy and transposing Directive (EU) 2019/944, with a focus on renewable energy for self-consumption (RE-SC). - Strengthen ERO's capacities to develop tariff and revenue methodologies reflecting the revised renewable energy support framework. - Develop national technical standards for EE and RE-SC in line with the EPB Law, the EU Energy Acquis and international best practices. - Develop technical standards for the grid integration of renewable energy and support the simplification of permitting and authorisation procedures. Work package (WP) 2: Financial Mechanisms Objective: Improve access to tailored financing mechanisms for EE and RES investments for self-consumption. Description: The contractor shall support KEEF in improving, expanding and operationalising financing mechanisms for EE and RE-SC investments. Particular emphasis shall be placed on developing financially sustainable instruments that increase investment uptake among households, municipalities and SMEs, while addressing affordability barriers for vulnerable groups. Key Outputs / Activities: - Advisory support to KEEF to fine-tune financing schemes for different target groups (households, SMEs, municipalities). - Design and structuring of support mechanisms and blended financial instruments, with a focus on multi-apartment buildings. - Identification of financing gaps and barriers, including affordability constraints, and formulation of targeted recommendations. - Preparation of recommendations to revise existing KEEF schemes based on lessons learned from pilot programs. - Support to operationalize monitoring and verification systems for EE and RES pilot projects. Work package (WP) 3: Human Capacity Development Objective: Strengthen institutional and human capacities to plan, implement, and monitor EE and RES measures at national and local levels. Description: Work Package 3 provides cross-cutting institutional and human capacity development measures supporting the implementation of Outputs 1, 2, 4 and 5. Key Outputs / Activities: - Capacity development for ME on inspection processes ensuring compliance with EE and RES regulations and standards. - Organizational development support to KEEF, including new structures, roles, and procedures linked to expanded financing mechanisms. - Training of KEEF staff on the operationalization of EE and RES financial instruments and schemes. - Capacity building for KEEF staff and municipalities to improve planning, implementation, and investment mobilization for EE and RES. - Support to municipalities in developing training programs on local energy and climate policies and measures. - Support to AKM to institutionalize a structured knowledge-sharing and training platform on EE and RES. - Design and delivery of replicable capacity-building programs (including ToT) for women in the energy sector, aligned with labor market needs. Work package (WP) 4: Women in Energy Network Objective: Improve conditions for increased participation and career development of women in the energy sector. Description: The consultancy shall support the operationalization of a Women in Energy Network of initially compromising approximately 100 members by advising on governance, mandate, and operational modalities. The Network will strengthen coordination among public institutions, civil society, academia, and private-sector actors. Key Outputs / Activities: - Advisory support to Agency of Gender Equality and Ministry of Economy to define the Network"s mandate, governance structure, mission, and cooperation mechanisms. - Support for formalized collaboration between steering institutions and operational partners to ensure sustainability and effectiveness of the Network.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 29. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.