Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHTED
Elektromobilität in Mexiko
Strategic, technical, and operational support to strengthen electromobility in Mexico. Three work packages: (1) Policy, Regulation & Technical Standards - develop national regulatory framework, technical standards for charging infrastructure, vehicles, interoperability, EV-ready buildings, battery lifecycle management, and interinstitutio...
Digitalisation Consulting, Public Administration Consulting, Vocational Training, Seminars, Management Consulting
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Published:
- May 10, 2026
- Deadline:
- June 09, 2026
- Topic:
- Digitalisation Consulting
Tender description
Strategic, technical, and operational support to strengthen electromobility in Mexico. Three work packages: (1) Policy, Regulation & Technical Standards - develop national regulatory framework, technical standards for charging infrastructure, vehicles, interoperability, EV-ready buildings, battery lifecycle management, and interinstitutional governance. (2) Multilevel Governance & Implementation - operationalize National Electric Mobility Strategy (ENME), develop state-level strategies, regulatory harmonization, identify financing mechanisms and business models for fleet electrification.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock1 detail capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Strategische und technische Unterstützung zur Förderung der Elektromobilität in Mexiko
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHDeadline: Jun 09Strategic, technical, and operational support to strengthen electromobility in Mexico. Includes developing a National Roadmap for E-Mobility Standards and Regulations, technical standards for charging infrastructure and vehicles, 'EV-ready' building requirements, battery lifecycle management, and multilevel governance coordination across federal, state, and local levels.81322784-Electromobility and urban infrastructure development for sustainable mobility in Mexico
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHDeadline: Jun 09To be provided are strategic, technical, and operational support to strengthen electromobility deployment in Mexico. The approach combines regulatory development, infrastructure planning, institutional coordination, and knowledge transfer, ensuring a coherent and scalable transition toward low-emission mobility systems. The activities will be structured under three core work packages: Work Package 1: Policy, Regulation and Technical Standards for Electromobility This work package focuses on establishing a coherent and harmonized regulatory framework to enable large-scale adoption of electromobility in Mexico. It aims to develop a National Roadmap for E-Mobility Standards and Regulations, serving as a strategic reference for federal and subnational authorities. - Development of a national regulatory framework aligned with international best practices - Definition of technical standards for charging infrastructure, vehicles, and system interoperability - Establishment of "EV-ready" requirements for buildings and urban infrastructure - Development of operational, safety, and maintenance standards for electric fleets - Definition of battery lifecycle management, including second-life and recycling protocols - Design of interinstitutional governance mechanisms for regulatory coordination This work package will result in a comprehensive White Paper consolidating regulatory recommendations, technical standards, and implementation pathways. Work Package 2: Multilevel Governance and Implementation of Electromobility This work package focuses on operationalizing electromobility policies through coordinated actions across federal, state, and local levels. - Implementation and operationalization of the National Electric Mobility Strategy (ENME) - Development of state-level electromobility strategies and implementation roadmaps - Design of regulatory harmonization frameworks across jurisdictions - Identification of financing mechanisms and business models for fleet electrification - Development of infrastructure planning guidelines and project pipelines - Integration of electromobility into climate policy instruments (NDC 3.0) This work package ensures that national policy objectives are translated into actionable measures and scalable projects. Work Package 3: Capacity Development, Training and Knowledge Transfer This work package focuses on strengthening institutional, technical, and operational capacities across stakeholders involved in the electromobility transition. - Design and implementation of training programs for public and private sector actors - Development of an online course on electromobility planning and implementation - Organization of workshops, webinars, and knowledge exchange events - Development of communication and knowledge products (guides, infographics, policy briefs) - Facilitation of stakeholder engagement and intersectoral dialogue This work package ensures that knowledge generated in the project is effectively transferred and institutionalized.Protected Area Management in Viet Nam
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHDeadline: Jun 08Technical assistance and capacity building for integrated protected area management in Viet Nam, covering conservation finance, digital monitoring, forest carbon, ecosystem restoration, and community-based tourism. Work packages: Output 1 improves regulatory/technical knowledge; Output 2 strengthens management boards' financial planning and investment mobilization. Requires international best practices adapted to Vietnamese context.Auftragsänderung 1: 81315669-Accompagnement technique des projets innovants des Algerian Agripreneurs
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornTechnical support for 'Algerian Agripreneurs' program under Innov-Agro project in Algeria. Targets two groups: (1) idea carriers (young women/men with ideas/prototypes) to develop business models and obtain 'innovative project' label; (2) start-ups/innovative projects to improve performance and market viability. Steps: Step 1 (completed) analysis of business opportunities; Step 2: attractiveness campaign to mobilize 300 participants.81318370 - Support to the AU Commission in operationalizing a broad M&E framework for the African Union Data Policy Framework (DPF)
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHThe development and implementation of a Monitoring, Evaluation and Learning (MEL) Framework for the AU Data Policy Framework is the subject of this tender. Under the supervision of the ISD of the AU Commission"s Infrastructure and Energy Department, this framework is expected to support the AU Commission, RECs and AU Member States in tracking progress on the implementation of the DPF, evaluating achievements with regards to its goals and objectives, reviewing implementation strategies and following-up with policy recommendations and learning opportunities on national, regional, and continental levels. The development of the MEL framework includes the validation of appropriate indicators as well as the identification and implementation of suitable digital tools for tracking the performance and impact of the DPF. The assignment will be conducted in coordination with experts from ISD, the AU Data Governance Committee and GIZ's DataCipation team. The planned procurement of the MEL Framework for the AU DPF entails the following components: Conceptualisation of MEL framework, establishment of tools for data collection and visualization, development of training material, conducting capacity trainings for AU Member States, as well as provision of technical support during data collection and adjustments to digital tools/dashboards.81319887 - Support in the implementation of basin management measures and district Ganga plans
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHObjective of this assignment: The implementation of 10 measures from the implementation programmes of the RBM and District Ganga Plans has begun, of which at least 2 will need to be with a climate focus, 2 with a gender focus and 1 with a climate and gender focus. This will be done through: - By enabling river basin management (RBM) and district Ganga committees (DGCs) to steer the development and implementation of measures - By ensuring coordination between actors responsible for specific measures at the basin as well as districts Tasks of this assignment: Through this tender GIZ seeks bids from the suitable firms to provide services towards prioritization and adoption of measures from the Ramganga Basin Management Plan, Udham Singh Nagar District Ganga Plan and Shahjahanpur District Ganga Plan. The decision making and facilitation of adoption of measures will be done by the respective stakeholder committees that are set-up as a formalized structure for the basin/ district management. The contractor shall technically support GIZ project team to bring in the European experiences towards facilitating adoption and implementation of ten selected measures. Based on this the contractor shall: - Provide technical inputs along with GIZ project team to participate and facilitate Basin Committee/ NMCG RBM Unit and respective District Ganga Committee (Udham Singh Nagar and Shahjahanpur) meetings. - Develop a detailed implementation strategy and provide knowledge support for its implementation for selected measures that will be supported by the project. - Develop a clear roadmap for implementation of basin and district level plans, this will include: a) the financial sustainability of implemented measures including M&E mechanisms (indicators based) for the prioritized measures b) guidance for the implementation and convergence of measures based on international experiences - Carry out capacity building of the responsible officials for developing project proposals - Provide inputs to develop content for specific outreach activities supporting implementation Please refer to the Terms of References and bidding conditions, and follow the instructions carefully.81322848 - Development of sustainable financial instruments in Senegal
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHTo fulfil the objective of this tender, there are four work packages (WP) that are structured according to the different instruments and tools that should be supported in the financial sector in Senegal. WP1 aims to support the readiness for a green bond issuance of up to two financial institutions (FTs). It includes supporting the FIs based on their demands and capacities, reviewing Senegal"s 2023 Sustainable Finance Framework, leading sensitization workshops, setting up work plans, ensure alignment with the regional and national green bond framework and taxonomy, identifying eligible projects, developing investor engagement strategies, and implementing capacity-building measures. The second WP aims to develop financial models for specific sectors and economic activities that are relevant in FI"s portfolio. It will support one bank in screening its project portfolio, selecting promising ideas, and developing financial models for three sectors such as eco-smart agriculture, energy efficiency, or improved water treatment. Tasks include setting up a work plan, defining eligibility criteria, conducting market research, adapting due diligence processes, designing loan products, and implementing capacity-building measures. WP3 focuses on strengthening the inclusion of ESG elements in the M&E System of the FIs. The scope of this work package will be to clarifying strategy, overall objectives and support with the drawing up of a model action plan for M&E system development and technical notes on Green Finance that can be applied to a multiplicity of Fis. Tasks include establishing a working group, designing ESG report structures, supporting the adaptation of action plans, overseeing input from member FIs, and implementing capacity-building activities. Lastly, WP4 addresses the lack of procedures to manage ESG portfolio risks in Senegal"s FIs. It involves selecting one advanced FI as a model case and developing a toolkit for assessing and managing environmental and climate-related portfolio risks. Tasks include setting up an in-house work group, analyzing the existing risk framework, developing a ESG risk model, supporting outline of compliance measures, and implementing capacity-building measures. All activities are tailored to the needs and demands for the financial sector partners. Thus, the tender also includes a potential extension of services on green and blue bonds and flexibility in the implementation is expected. All activities are to be conducted in close cooperation with the main implementing partners the financial institutions and the GIZ project team, as well as the political partner Ministry of Finance (MFB). An important criterion for the services to be provided is to cooperate with other service providers working on the implementation of the Senegalese green taxonomy and considering the work on the policy level for the cooperation with the financial institutions.81321405 - Development of an innovative financial instrument to improve the bankability of African PtX projects, and to crowd in institutional investors from global financial hubs
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHThe objective of this assignment is to study, design, and validate the concept of a potential investment instrument - such as a fund - that is based on a Project-Backed Security structure or a comparable financial mechanism. This instrument should be capable of incorporating a mix of financial tools, including equity, debt, and mezzanine capital, and should be tailored to support the development of a global hydrogen project ecosystem. The instrument should be designed to channel investment into a diversified portfolio of PtX projects across the value chain. To attract institutional investors and mitigate the inherent risks of large-scale infrastructure projects, the structure must be anchored in the projects' future cash flows, assets, performance and guarantees to form specific risk/return profiles. Additionally, it should aim to deliver stable, predictable returns, avoiding high volatility, and be supported by a robust financial model that clearly outlines both potential upsides and downsides. It will be critical to explore and evaluate multiple structuring options for this financial instrument and validate them through engagement with relevant stakeholders, including investors. A systematic approach shall be adopted to identify and engage investors, structure the financial mechanisms, and ensure legal and regulatory compliance. The structured instrument shall focus on a long-term lifecycle of 15-20 years to enable targeted investments across the global hydrogen value chain, enhancing both financial viability and scalability. The final concept must not only align with investor expectations for financial return and risk management but also comply with applicable capital market regulations to ensure feasibility and long-term viability.Freistaat Sachsen, Aufbau einer Ladeinfrastruktur Elektromobilität
Staatsbetrieb Sächsisches Immobilien- und Baumanagement, NL BautzenBautzenBei der zu vergebenden Leistung handelt es sich um eine Rahmenvereinbarung für die Lieferung von Wallboxen und Zubehör für die dienstliche Ladeinfrastruktur auf den Liegenschaften des Freistaates Sachsen. Der Umfang der Leistung besteht aus: 150 St. Wallbox als Wand-Ladestation zur AC-Ladung von elektrischen Fahrzeugen, mit 1x Typ 2-Steckdose 32 A/400 V AC, für Lademodus 3 (Ladebetriebsart 3) maximale Ladeleistung von 22 kW, Ladefähigkeit 3-phasig und 1-phasig, Ladenennstrom von 6 A bis 32 A einstellbar, mind. Schutzart IP 54 für die Montage im ungeschützten Außenbereich, mit direkter Sonneneinstrahlung oder im Innenbereich, mit integriertem Fehlerstromschutzschalter mit Auslösung von max. 6 mA, mit automatischer Leistungsreduktion bei Übertemperatur, Freigabe/Autorisierung der Ladung über vorhandene einheitliche RFID-Chips und RFID-Karten des Auftraggebers, mit Vorbereitung für ein Lastmanagement nach dem Master-Slave-Prinzip, Lastmanagement mit der Möglichkeit der Priorisierung, Steuerbarkeit nach EnWG § 14a 350 St. Wallbox wie vor, jedoch mit 2x Typ 2-Steckdose 32 A/400 V AC, maximale Ladeleistung von 2x 22 kW 75 St. Standsäule, zur Aufnahme von 1 St. v.g. Wallbox, für eine Höhe der Ladesteckdose Typ 2 der Wallbox zwischen 1,00 und 1,30 m, für die standsichere Montage auf einem bauseitigem Beton- oder Fertigfundament 150 St. Standsäule wie vor, jedoch zur Aufnahme von 2 St. v.g. Wallbox 100 St. Energiemanagementsystem für die Leistungssteuerung der Wallboxen auf Basis der Leistung am NetzverknüpfungspunktHerstellung der Aussenanlagen am Übergangswohnheim mit Verkehrsflächen, Terrasen, Zaunbau, Bepflanzung, Geländemodellierung, Regenwasserentwässerung, Fundamenten für Elektromobilität, Nebengebäude für Fahrräder und Spielgeräte
Staatliches Bauamt KemptenDeadline: Mar 19Herstellung der Aussenanlagen am Übergangswohnheim mit Verkehrsflächen für Fußgänger und ruhenden Verkehr, Terrasenflächen, Zaunbau und Bepflanzung Geländemodellierung Anschluss Regenwasserentwässerung Einbau Fundamente für Elektromobilität und Nebengebäude Fahrräder, sowie Spielgeräte
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 09. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.