New: market reports on German public procurement Read the report

Back to blog

Guides

Checklist: Thoroughly Reviewing Tender Requirements

Missing documentation, overlooked eligibility criteria, hidden grounds for exclusion, companies that don't systematically review tender documents risk rejection. This checklist helps prevent costly mistakes.

Auftrag One Team··6 min read

Why bids get rejected

The most common reasons for bid rejection aren't content weaknesses, they're formal errors. Missing documentation, unsigned declarations, overlooked eligibility criteria. Errors that could have been prevented with systematic review of the tender documents.

The challenge: tender documents are lengthy, complex and scattered across multiple files. A typical EU-wide tender consists of:

  • Notice (short version on the procurement platform)
  • Participation conditions
  • Scope of services (often 30-100 pages)
  • Contract terms (EVB-IT, VOL/B or similar)
  • Eligibility criteria and proof requirements
  • Award criteria and scoring matrix
  • Forms and self-declarations

Whoever doesn't work through these documents systematically will miss details. And in procurement law, details can determine award or rejection.

The complete review checklist

Phase 1: Initial assessment (Should I bid?)

Before investing time in detailed review, clarify the basic fit:

Check relevance:

  • Does the scope of services match our core business?
  • Is the place of performance in our service area?
  • Is the estimated contract volume attractive for us?
  • Does the contract duration fit our capacity planning?

Pre-check eligibility criteria:

  • Do we meet the required revenue thresholds of the last 3 years?
  • Do we have the required number of comparable references?
  • Do we have all required certifications (e.g., ISO 9001, ISO 27001)?
  • Do we meet the personnel requirements (qualifications, experience)?

Assess financial viability:

  • Does the scope of services suggest a realistic budget?
  • How high is the bid preparation effort relative to expected income?
  • Are there past award data for comparable procedures?

Rule of thumb: If you don't meet more than two eligibility criteria, the effort for a bid is in most cases not justified.

Phase 2: Detailed review of tender documents

If the initial assessment is positive, begin systematic review:

Formal requirements

  • Bid deadline noted and entered in calendar (with buffer)
  • Bid format clarified: purely electronic? Which platform? Which format?
  • Binding period checked, how long must the bid remain valid?
  • Lot structure understood, which lots are we bidding on?
  • Variants allowed? Under what conditions?
  • Bidding consortia permitted? What declarations are needed?

Eligibility documentation

CategoryTypical RequirementsReview Point
AbilityTrade register excerpt, business registration, professional register entryCurrent and complete?
Financial capacityAnnual turnover, balance sheets, insurance proofThresholds met?
Technical capacityReferences, staff size, qualifications, certificationsAll documentation present?
ReliabilitySelf-declaration on grounds for exclusion (§ 123, 124 GWB)Form signed?

Common mistake: References that don't exactly meet the required criteria (e.g., a €500,000 reference is required, but you submit a €480,000 one). Check each reference requirement individually against your actual projects.

Scope of services

  • All required service components identified and understood?
  • Optional services recognized and calculated separately?
  • Quality requirements and minimum standards noted?
  • Response times, service levels and penalties identified?
  • Are there unclear points that warrant a bidder question?
  • Quantity schedules realistic or potentially flawed?

Award criteria and scoring matrix

  • All award criteria and their weighting captured?
  • Understood how points are awarded?
  • Price formula known (lowest price, cost-benefit analysis, other)?
  • Concept evaluation: Which content is expected, how detailed?
  • Price-to-quality ratio, where is the leverage?

Practical tip: If price accounts for 60% or more of the overall evaluation, typically the lowest bidder wins. With higher quality weighting, it pays to invest more in your concept.

Contract terms

  • Which contract terms apply (EVB-IT, VOL/B, BVB)?
  • Are there special contract terms from the contracting authority?
  • Liability provisions and insurance requirements reviewed?
  • Termination rights and contract duration understood?
  • Confidentiality and data protection requirements captured?

Phase 3: Before submission

Final review before sending:

  • All required forms completed and signed?
  • All required documentation attached as appendices?
  • Price sheet complete and arithmetically correct?
  • Concept contains all required structure points?
  • Bid submitted on the correct platform?
  • Bid submitted before the deadline (don't wait until the last minute)?
  • Second person has reviewed the bid?

The 5 most common mistakes in requirement review

1. Eligibility criteria checked too late

Many companies spend days on bid preparation only to discover shortly before submission that they're missing a required reference or certification. Check eligibility first, before writing a single line of your concept.

2. Confusing minimum requirements with award criteria

Minimum requirements must be met, or rejection threatens. Award criteria affect your score. Mixing the two wastes effort in the wrong place.

3. Not fully completing forms

An empty field on a form can lead to rejection. Some contracting authorities treat incompletely filled forms as missing documentation.

4. Not asking bidder questions

If tender documents are unclear or contradictory, you have the right to ask questions. The answers are binding for all bidders. Not asking risks misinterpreting the requirements.

5. Not following bid format

If a tender requires a PDF bid with maximum 20 pages of concept, don't submit a 35-page Word document. Formal requirements are taken seriously.

How AI helps with requirement review

Systematic review of tender documents is time-consuming, especially with extensive scopes of service. AI-powered tools can accelerate this process:

  • Automatic extraction of eligibility criteria, deadlines and proof requirements from documents
  • Comparison with company profile: Which requirements do we meet, where are the gaps?
  • Highlighting critical passages: Penalties, special contract terms, unusual requirements
  • Checklist generation based on the specific tender

This doesn't replace expert review by an experienced bid manager. But it ensures nothing is overlooked.

At Auftrag One, the AI analyzes tender documents and delivers you a structured overview: requirements, deadlines, award criteria and risks, so you can focus on your bid content instead of hunting through pages for hidden requirements.


This checklist serves as guidance. Specific requirements vary by tender type, contracting authority and legal framework. When in doubt, consult a procurement law specialist.

Ready for more contracts?

Discover how Auftrag One helps you find matching tenders.

Start for free